Skip to content
Georgia Commons
Menu

Walker County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 22 - LAND DEVELOPMENT / Article IV - ZONING / Division 5 - SPECIAL USES AND PERMITS

Sec. 22-287. Conditions of issuance.

About this text

  • As published by Municode, current through 2026-07-09
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Each Class 1 special use permit may be issued, provided that all of the following conditions are met:

(1) Adequate space for off-street parking shall be provided.

(2) A 750-yard setback buffer distance shall be maintained from the nearest building line of the nearest dwelling.

(3) A 500-yard setback buffer distance from the nearest building line of a non-dwelling building structure used for human occupancy (such as businesses, industrial buildings, commercial offices, etc.) must be maintained.

(4) A 250-yard setback buffer distance from private property lines shall be maintained for aesthetic reasons.

(5) Other provisions of this article (including, but not limited to, type of zoning at the site, setback buffers and screening) applying to the particular use and the type of use shall be complied with.

(6) Such use shall not occur within a 2-mile radius of the most significant groundwater recharge areas shown on the comprehensive plan.

(7) The use shall be consistent with the comprehensive plan for the area.

(8) The proposed use must be able to be served by adequate public utilities.

(9) Adequate traffic routes and entrances must be established, including consideration of the deterioration of the existing roadway, expenditure of public funds to maintain roadways, adequacy and safety of road intersections, road widths on roads within and leading to the property, pavement conditions (material, thickness, age, etc.), width and length of property boundaries at road access areas and type of vehicles that may be used at the property.

(10) The lot size must be sufficient in order to provide the operation space needed for the proposed use to carry out all business-related transactions without infringing on setback and other requirements of this article.

(11) The owner and/or permit holder must provide adequate screening of the entire premises. The screening must effectively screen the premises on a year-round basis and must be compatible with the facility's surroundings. All screening must meet the criteria set forth in section 22-322(e) and (f).

(b) Once the Planning Commission shall have determined that all of the foregoing requirements have been satisfied, it must further find that the benefits of and need for the proposed use are greater than any possible depreciating effects and damages to the neighboring properties before a Class 1 special use permit for such uses can be granted.

(c) Each Class 1 special use permit shall contain such terms and conditions as are deemed necessary by the Planning Commission to protect the environment, public health and safety. The Planning Commission may require such testing and construction supervision as it deems necessary to protect the environment and public health and safety.

History

The history line the source prints at the end of the section.

(Code 2005, § 34-347; Ord. of 7-20-1994, § 6.06)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:walker-county/zoning/22-287@2026-07-09-53269f727f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Walker County Zoning Ordinance, Sec. 22-287. Conditions of issuance | Georgia Commons