Walnut Grove · Code of Ordinances

Chapter 42 - UTILITIES / Article II - SEWER SYSTEM

Sec. 42-24. Building sewers and connections.

About this text

  • As published by Municode, current through 2025-09-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Disturbance of public sewers. No person shall uncover, make any connections with or opening into, or use, alter or disturb any public sewer or appurtenance without first obtaining a permit.

(b) Building sewer permits. There shall be three classes of permits:

(1) For residential;

(2) For commercial service; and

(3) For service to establishments producing industrial wastes.

In either case, the owner or his/her agent shall make application on a special form furnished by the city. The permit application shall be supplemented by any plans, specifications or other information considered pertinent in the judgment of the superintendent. A permit and inspection fee shall be paid to the city at the time the application is filed. Permit and inspection fees shall be determined from time to time by the city and set forth in the schedule of fees and charges.

(c) Owner liable for all costs. All costs and expenses of the installation and connection of the sewer shall be borne by the owner, including, but not limited to, boring under the entire road, backfilling and surface restoration of open-cut installation across and in city streets, county roads, and state highways. The owner shall indemnify the city from any loss or damage that may directly or indirectly be occasioned by the installation of the sewer.

(d) Separate sewers required; exceptions. A separate building sewer shall be provided for every building, except where one building is at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building, the sewer line from the front building may be extended to the rear building and the whole considered as one building sewer.

(e) Old sewers to meet requirements of section. Old building sewers may be used in connection with new buildings only when they are found, on examination and testing by the superintendent, to meet all requirements of this section and supporting evidence has been provided to and approved by the superintendent. Supporting evidence may include pressure testing, mandrel passing, video inspecting, and smart pigging (internal profiling) to be conducted at applicant's expense.

(f) Adherence to building regulations. The size, slope, alignment, materials, and methods in excavating, placing of the pipe, jointing, testing, and backfilling, shall all conform to the requirements hereof and other applicable rules and regulations of the city. Materials and procedures in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply as well as the city's standards. Whichever is more stringent shall govern.

(g) Gravity flow desirable. Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by an approved means and discharged to the building sewer.

(h) Residential ejector (lift station) allowed. Where elevation prohibits gravity flow, a ejector station/lift station may be installed, provided such installations meet the following requirements:

(1) A retention tank as close in proximity to the outside structure wall as the last intersection of drain lines allowing it to contain all sanitary sewer wastewater discharged from the structure.

(2) The tank shall be sized and configured per health department and other governing agencies.

(3) A submersible grinder pump shall be installed in the outlet chamber of the tank.

(4) The pump outlet piping shall be installed to move wastewater out of the tank and into the connection to the city gravity flow sanitary sewer piping system.

(i) Surface runoff prohibited. No person shall make connection of roof downspouts, exterior foundation drains, areaway drains, or other sources of surface runoff or groundwater to a building sewer that is connected directly or indirectly to a public sanitary sewer.

(j) Building codes to be followed. The connection of the building sewer shall conform to the requirements of building and plumbing codes, and the administration thereof, adopted by the city. All such connections shall be gastight and watertight. Any deviation must be approved by the building inspector per this Code.

(k) EPA and EPD regulations. Any new industry or establishment producing industrial wastes shall comply with all regulations of the EPA and EPD, prior to connection with city sewer.

(l) Connection to be overseen by superintendent. The applicant shall notify the superintendent when the sewer is ready for connection to the public sewer. The connection shall be made under the supervision of the superintendent. Any installation requiring an excavation shall remain uncovered until the superintendent has documented an approved inspection.

(m) Care of public property. All excavations shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the city.

(n) Application to install a FOG pretreatment system.

(1) FOG pretreatment systems shall be provided for all new and existing food preparation establishments, including restaurants, cafeterias, diners, and similar non-industrial facilities using food preparation processes.

(2) All new food preparation establishments, as determined by the city, shall include the design and specifications for the FOG pretreatment system as part of the sewer connection application as described in the city's ordinance.

(3) All existing food preparation establishments which require a new FOG pretreatment system, as determined by the city, shall submit an application for the installation of a new FOG pretreatment system within 12 months of adoption of the ordinance from which this article is derived. The application shall be in accordance with city's ordinance. The approved FOG pretreatment system shall be installed within one year of adoption of the ordinance from which this article is derived.

(4) All existing food preparation establishments which have an existing FOG pretreatment system may, as determined by the city, keep the existing system in operation. Such facilities shall submit an application for an alternate FOG pretreatment system, as described in subsection (p)(3) of this section. Such application shall be submitted within 12 months of adoption of the ordinance from which this article is derived.

(5) All costs and related expenses associated with the installation and connection of the FOG interceptor or alternate FOG pretreatment system shall be borne by the food preparation establishment, which shall defend, indemnify, and hold harmless the city and its officers, employees, representatives, and agents from and against any loss or damage that may directly or indirectly occur due to the installation of the FOG pretreatment system.

(o) Pretreatment system requirements.

(1) An application for the design and installation of a FOG pretreatment system shall be subject to review and approval by the city per its ordinance, and subject to the requirements of all other applicable codes, ordinances and laws.

(2) Except as provided by subsection (p) of this section, the wastewater generated from food preparation establishments shall be treated to remove FOG using a FOG interceptor.

(3) Every structure at the facility shall be constructed, operated and maintained to ensure the discharge of food preparation wastewater is directed solely to the FOG interceptor, or alternate FOG pretreatment system. No valve or piping bypass equipment that could prevent food preparation wastewater from entering appropriate treatment equipment shall be present.

(4) The contact person at each food preparation establishment shall notify the city when the FOG pretreatment system is ready for inspection and connection to the public sewer. The connection and testing shall be made under the supervision of the city inspector.

(5) All applicable plumbing and building codes shall be followed during the installation of the FOG pretreatment system.

(6) FOG interceptor requirements.

a. The FOG interceptor shall be installed on a separate building sewer line servicing kitchen flows and shall be connected to fixtures or drains which would allow fats, oils, and grease to be discharged. This shall include:

1. Pot sinks;

2. Pre-rinse sinks;

3. Any sink into which fats, oils and grease are likely to be introduced;

4. Soup kettles or similar devices;

5. Workstations;

6. Floor drains or sinks into which kettles may be drained;

7. Automatic hood wash units;

8. Dishwashers without pre-rinse sinks; and

9. Any other fixtures or drains that are likely to allow fats, oils, and grease to be discharged.

b. No food grinder shall discharge to the FOG interceptor.

c. No fixture or drain other than those listed in subsection (o)(6)a of this section shall be directly connected to the FOG interceptor unless approved by the city in writing.

d. An outdoor FOG interceptor shall have a minimum depth of four feet and a minimum detention time of the greater of:

1. At least 24 hours of the maximum daily flow from the fixtures described in subsection (o)(6)a of this section based on water meter records or other methods of calculation as approved by the superintendent representative; or

2. 1,000 gallons.

e. FOG interceptors shall have a minimum of two compartments, separated by a baffle that extends from the bottom of the FOG interceptor to a minimum of five inches above the static water level. An opening in the baffle shall be located at mid-water level. The size of the opening shall be at least eight inches in diameter but not have an area exceeding 180 square inches.

f. FOG interceptors shall be watertight and constructed of precast concrete, or other durable material. It shall be accessible for convenient inspection and maintenance. No permanent or temporary structures or containers shall be placed directly over the FOG interceptor. FOG interceptors installed in areas subject to traffic shall be designed to accommodate traffic loading.

g. FOG interceptors constructed of precast concrete shall meet the following:

1. All concrete FOG interceptors shall be fabricated using minimum 4,000 psi concrete per ASTM standards with four to seven percent air entrainment.

2. The FOG interceptor shall have a minimum liquid depth of 36 inches, measured from the bottom of the tank to the outlet invert.

3. The air space provided between the liquid height and the underside of the tank top shall be a minimum of eight inches.

4. All structural seams and/or lifting holes shall be grouted with non-shrinking cement or similar material and coated with a waterproof sealant. In areas where seasonal high groundwater is at an elevation greater than the bottom of the FOG interceptor, but below the top of the FOG interceptor, the exterior top, sides and bottom shall be coated with a waterproof sealant creating a watertight condition for the tank. In areas where seasonal high groundwater is at an elevation greater than the top of the FOG interceptor, the exterior of the manhole extensions to grade shall be coated with a waterproof sealant creating a watertight condition for the extension.

5. The manhole cover shall be placarded with the warning "Entrance into the tank could be fatal."

6. Voids between the FOG interceptor's walls and inlet and outlet piping shall be grouted with non-shrinking cement and coated with a waterproof sealant.

7. The liquid capacity of the tank shall be marked on the top of the tank between the outlet access hole and the outlet wall or on the vertical wall between the top of the tank and the top of the outlet opening.

8. The invert elevation of the inlet shall be between three inches and six inches above the invert elevation of the outlet.

h. All non-concrete septic tanks must be meet all the performance requirements for concrete tanks and are subject to prior written approval for use by the city wastewater collection and sewage treatment department.

i. Separate cleanout covers shall be provided over the inlet and outlet of the FOG interceptor so as to provide easy access for inspection and cleaning. Cleanout ports shall be fitted with manhole extensions to grade. In areas subject to traffic, the extensions shall ductile iron frames and round manhole covers. Where concrete covers are used, the lid must either weigh a minimum weight of 59 pounds or contain a locking mechanism to prevent unauthorized entrance. The manholes, extensions, and inlet and outlet access holes to the FOG interceptor shall have a minimum inside diameter of 17 inches.

j. The inlet and outlet piping shall be PVC meeting ASTM D 1785 Schedule 40 with rubber compression gaskets or solvent weld couplings. The joints must meet ASTM D 3212 specifications. The superintendent of wastewater collection and sewage treatment department may approve other piping materials for use. The minimum diameter of the inlet and outlet piping shall be four inches. The inlet and outlet shall utilize a tee-pipe fitting on the interior of the FOG interceptor. No caps or plugs shall be installed on the tee-pipes. The tee-pipe on the inlet and outlet shall extend to within 12 inches of the bottom of the tank and at least five inches above the static liquid level of the tank.

k. The FOG interceptor shall be set level on a consolidated, stable base that has been mechanically compacted, with a minimum of six inches of crushed stone so that no settling or tipping of the FOG interceptor can occur. Select backfill shall be placed and compacted around the FOG interceptor in a manner to prevent damage to the tank and to prevent movement caused by frost action.

l. The outlet discharge line from the FOG interceptor shall be directly connected to the municipal sanitary sewer.

m. The FOG interceptor shall be located to maintain the separating distances from well water supplies in O.C.G.A. § 12-5-134(1)(A)(i)(II).

n. The following minimum-separating distances shall be maintained between the FOG interceptor and the items listed below:

1. Property line: ten feet.

2. Building served (no footing drains): 15 feet.

3. Groundwater intercepting drains, footing drains and storm drainage systems: 25 feet.

4. Open watercourse: 50 feet.

o. When necessary due to installation concerns, testing for leakage will be performed using either a vacuum test or water-pressure test.

1. Vacuum test. Seal the empty tank and apply a vacuum to two inches of mercury. The tank is approved if 90 percent of the vacuum is held for two minutes.

2. Water-pressure test. Seal the tank, fill with water, let stand for 24 hours. Refill the tank. The tank is approved if the water level is held for one hour.

(p) Alternate FOG pretreatment system.

(1) When it is not practical for the food preparation establishment to install an outdoor in-ground FOG interceptor per subsection (o) of this section, an alternate FOG pretreatment system may be utilized only upon written approval by the wastewater collection and sewage treatment department and upon receiving a notification of approved alternative FOG pretreatment system. Approval of the system shall be based on demonstrated (proven) removal efficiencies and reliability of operation. The wastewater collection and sewage treatment department will approve these systems on a case-by-case basis. The contact person may be required to furnish analytical data demonstrating that FOG discharge concentrations do not exceed the limits established in this section.

(2) Alternate FOG pretreatment systems shall consist of a FOG recovery unit meeting the requirements of subsection (p)(4)d of this section, unless there are special circumstances that preclude such installation, as approved by the wastewater collection and sewage treatment department, and in accordance with subsection (p)(4)e of this section.

(3) Alternate FOG pretreatment systems shall meet the requirements of subsection (o)(1) through (5) of this section and shall be installed immediately downstream of each of the fixtures and drains listed in subsection (o) of this section and shall meet the requirement of subsection (o)(6)b and c of this section.

(4) Alternate FOG pretreatment system requirements.

a. FOG recovery units shall be sized to properly pretreat the measured or calculated flows using methods approved by the sewage treatment department.

b. FOG recovery units shall be constructed of corrosion-resistant material such as stainless steel or plastic.

c. Solids shall be intercepted and separated from the effluent flow using a strainer mechanism that is integral to the unit.

d. The FOG recovery unit shall operate using a skimming device, automatic draw-off, or other mechanical/hard wired electrical means to automatically remove separated FOG. This automatic skimming device shall be controlled using a timer or level control. The operation of the automatic skimming device shall be field adjustable. The FOG recovery unit timer shall be set to operate the unit no less than once per day.

e. FOG recovery units shall be fitted with an internal or external flow control device to prevent the exceedance of the manufacturer's recommended design flow.

f. FOG recovery units shall permit frequent access for maintenance and inspection.

(5) Other alternate FOG pretreatment system. Other alternate FOG pretreatment systems that do not meet the requirements of subsection (o)(6) or (p)(4) of this section may be considered for approval by the sewage treatment department on a case-by-case basis. The application shall include documented evidence that the proposed alternate FOG pretreatment system will not discharge FOG concentrations that exceed the discharge limits per subsection (e) of this section.

History

The history line the source prints at the end of the section.

(Ord. of 6-8-2017, exh. A(21))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:walnut-grove/code/42-24@2025-09-23-ee0757c79d