--- title: Walthourville Zoning Ordinance, Sec. 12.10. Application and permit fees collection: local-codes id: local-code:walthourville/zoning/12.10 cite_as: Walthourville, Ga., Zoning Ordinance § 12.10 canonical_url: https://georgiacommons.org/code/local/walthourville/zoning/12.10 md_url: https://georgiacommons.org/code/local/walthourville/zoning/12.10.md text_url: https://georgiacommons.org/code/local/walthourville/zoning/12.10/text source_url: https://library.municode.com/ga/walthourville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:walthourville jurisdiction_name: Walthourville place_fips: "1380256" corpus_version: local-codes-walthourville-2537bfdd13ea publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/walthourville/zoning/~appendix-a/~article-xii.md previous: https://georgiacommons.org/code/local/walthourville/zoning/12.9.md next: https://georgiacommons.org/code/local/walthourville/zoning/12.11.md index: https://georgiacommons.org/code/local/walthourville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:walthourville/zoning/12.10@2026-11-11-be870e3ae7 --- # Walthourville Zoning Ordinance, Sec. 12.10. Application and permit fees > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article XII - TELECOMMUNICATIONS TOWERS AND ANTENNAS The following fees will be required of any applicant submitting an application under this article: 12.10.1 Administrative approval of new tower construction. An application for construction of a new tower up to a height of three hundred (300) feet in A-1, AR-1 or I-1 zoning districts, otherwise eligible for administrative approval, shall be one thousand dollars ($1,000.00). 12.10.2 Administrative approval of antenna location on tower or alternative tower structure. An application for location of an antenna on an existing tower or alternative tower structure (so long as the addition of said antenna adds no more than ten (10) feet to the height of the existing tower or structure), otherwise eligible for administrative approval, shall be two hundred fifty dollars ($250.00). 12.10.3 Conditional use permit for construction of new tower. An application for construction of a new tower (including the placement of additional buildings or other supporting equipment used in connection with said tower or antenna) not eligible for administrative approval shall be two thousand dollars ($2,000.00). 12.10.4 Conditional use permit for location of antenna on tower or alternative tower structure. An application for location of an antenna on an existing tower or alternative tower structure, not eligible for administrative approval, shall be five hundred dollars ($500.00). 12.10.5 Building permit fees. In addition to the application fees set forth herein, the applicable construction and utility inspection permit fees in effect at the time of the application for the permit shall apply. The foregoing permit fees shall also be in addition to any and all other costs and expenses required by this article to be borne by the applicant. ## History (Ord. No. 2000-002, § I, 10-3-2000)