--- title: Washington Zoning Ordinance, Sec. 90-776. Solar farms collection: local-codes id: local-code:washington/zoning/90-776 cite_as: Washington, Ga., Zoning Ordinance § 90-776 canonical_url: https://georgiacommons.org/code/local/washington/zoning/90-776 md_url: https://georgiacommons.org/code/local/washington/zoning/90-776.md text_url: https://georgiacommons.org/code/local/washington/zoning/90-776/text source_url: https://library.municode.com/ga/washington/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:washington jurisdiction_name: Washington place_fips: "1380704" corpus_version: local-codes-washington-eefef5283fc6 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/washington/zoning/~part-ii/~chapter-90/~article-vi/~division-6.md previous: https://georgiacommons.org/code/local/washington/zoning/90-775.md next: https://georgiacommons.org/code/local/washington/zoning/90-777-to-90-800.md index: https://georgiacommons.org/code/local/washington.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:washington/zoning/90-776@2026-11-11-d343d64ac1 --- # Washington Zoning Ordinance, Sec. 90-776. Solar farms > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 90 - ZONING / Article VI - SUPPLEMENTAL REGULATIONS / Division 6 - SOLAR COLLECTION SYSTEMS Solar farms shall be permitted only in an M-2 general industrial district, in accordance with the following regulations: (1) Solar farms shall be enclosed by perimeter fencing to restrict unauthorized access at a minimum height of six feet, which shall be maintained in good condition, and any gates shall be securely locked. (2) The manufacturers' or installers' identification and appropriate warning signage shall be posted at the site in a clearly visible manner. At least one sign shall be posted at the entrance to the facility showing the owner's name, address and emergency contact information. (3) On-site power lines shall, to the maximum extent practicable, be placed underground. (4) Solar farms shall adhere to the requirements of the district in which they are located, including but not limited to setbacks, height, lot area coverage requirements and buffer requirements. a. Where a solar farm is located on a major street, solar plant structures must be located a minimum of 100 feet from the right-of-way. b. A solar farm with solar panels within 100 feet of any street must have sufficient barriers to prevent a passenger vehicle leaving that street at the maximum speed limit from entering the solar field. A �passenger vehicle� means every motor vehicle having a gross vehicle weight of 10,000 pounds or less. (5) The following requirements shall be met for permit applications: a. A descriptive plot plan including setbacks, panel sizes, locations of property lines, buildings, and road right-of-ways. b. The plan shall include a fire suppression system sufficient to prevent a fire from spreading off the site. c. No solar farm shall be installed until evidence has been given to the city that the electric utility company has been informed of the customer's intent to install an interconnected customer-owned generator. Off-grid systems shall be exempt from this requirement. d. An affidavit or evidence of agreement between lot owner and the facility's owner or operator confirming that the owner or operator has permission of the property owner to apply for necessary permits for construction and operation of the urban solar farm. e. Proof of notification to the managing authority of any airport located within five miles of the proposed location. f. Any other relevant studies, reports, certificates and approvals as may be reasonably requested by the city, including but not limited to design review. (6) The following requirements shall be met for decommissioning solar farms: a. Each applicant for a permit must submit decommissioning plans that describe the anticipated life of the solar project, the party responsible for decommissioning, the estimated decommissioning costs in current dollars, and the method for ensuring by bond that funds will be available for decommissioning and restoration. b. Preferred bond instruments shall include cash or surety from a bonding company with authority to operate in the State of Georgia and approved by the city. The bond shall consist of three components for purposes of determining its amount. The first component will address environmental liabilities including hazardous materials liabilities, such as risks associated with hazardous waste and hazardous substances. The second component will address the decommissioning, removal, and proper disposal, as appropriate, of improvements and facilities. The third component will address reclamation, revegetation, restoration, and soil stabilization. There shall be a single instrument to cover all potential liabilities. The entire bond amount may be used to address a single risk event such as hazardous materials release or groundwater contamination regardless of the fact that in calculating the total bond amount other risks were also considered. If the bond is used to address a particular risk, the holder would then be required to increase the bond amount to compensate for this use. c. Solar farms which have not been in active and continuous service for a period of one year shall be removed at the owner's or operator's expense. d. The site shall be restored to as natural condition as possible within six months of the removal. e. A site will be considered decommissioned when, after inspection and approval by the city, all structures and equipment are removed and the site is re-vegetated. ## History (Ord. of 12-12-2016)