Skip to content
Georgia Commons
Menu

Washington · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 90 - ZONING / Article VII - ADMINISTRATION AND ENFORCEMENT / Division 1 - GENERALLY

Sec. 90-803. Building permits.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) It shall be unlawful to commence the excavation for the construction of any building or structure, including accessory structures, or to commence the moving, alteration, or repair of any structure, including accessory structures, until the building official has issued for such work a building permit containing a statement that the plans, specifications and intended use of such structure in all respects conform with this chapter.

(b) Application for a building permit shall be made in writing to the building official on forms provided for that purpose.

(c) It shall be unlawful for the building official to approve the plans or issue a building permit for any excavation or construction until he has inspected such plans in detail and found them to be in conformity with this chapter. To this end, the building

official shall require that every application for a building permit for excavation, construction, moving, or alteration shall be accompanied by a plan or plat drawn to scale and showing the following in sufficient detail to enable the building official to ascertain whether the proposed excavation, construction, moving or alteration is in conformance with this chapter:

(1) The actual shape, location, and dimensions of the lot to be built upon.

(2) The shape, height, use and location on the lot of buildings or structures to be erected or altered.

(3) The sizes, locations, and use of all existing buildings or structures on the lot.

(4) The number of dwelling units the building, if residential, is designed to accommodate.

(5) The setback lines of buildings on adjoining lots.

(6) The layout of off-street parking and unloading spaces.

(7) The signature of the county health officer approving the proposed location of the septic tank, and field lines provided public sewerage is not available.

(8) Such other information concerning the lot or adjoining lots as may be essential for determining whether this chapter is being observed.

(d) If the proposed excavation, construction, moving or alteration as set forth in the application for a building permit is in conformity with this chapter, the building official shall issue a building permit for such excavation, construction, moving or

alteration.

(e) If the application for a building permit is not approved, the building official shall state in writing on the application the cause for such disapproval. Issuance of a permit shall, in no case, be construed as waiving any section of this chapter, and building

permits shall be void after six months from the date of issuance unless substantial progress on the project has been made by that time.

History

The history line the source prints at the end of the section.

(Ord. of 6-2-1997, § 19-142)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:washington/zoning/90-803@2026-11-11-675de61ce3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Washington Zoning Ordinance, Sec. 90-803. Building permits | Georgia Commons