--- title: Watkinsville Zoning Ordinance, Sec. 3.7. Final subdivision plat collection: local-codes id: local-code:watkinsville/zoning/3.7 cite_as: Watkinsville, Ga., Zoning Ordinance § 3.7 canonical_url: https://georgiacommons.org/code/local/watkinsville/zoning/3.7 md_url: https://georgiacommons.org/code/local/watkinsville/zoning/3.7.md text_url: https://georgiacommons.org/code/local/watkinsville/zoning/3.7/text source_url: https://library.municode.com/ga/watkinsville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:watkinsville jurisdiction_name: Watkinsville place_fips: "1380788" corpus_version: local-codes-watkinsville-c567989ba790 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/watkinsville/zoning/~appendix-b/~article-3.md previous: https://georgiacommons.org/code/local/watkinsville/zoning/3.6.md next: https://georgiacommons.org/code/local/watkinsville/zoning/4.1.md index: https://georgiacommons.org/code/local/watkinsville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:watkinsville/zoning/3.7@2026-11-11-c64a5566ae --- # Watkinsville Zoning Ordinance, Sec. 3.7. Final subdivision plat > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SIGN ORDINANCE § 13[12] / Article 3 - SUBDIVISION APPLICATION PROCEDURE AND APPROVAL PROCESS No land shall be sold or transferred, or a building permit issued until the final plat has been approved and recorded. Periodic inspection during installation of improvements in a subdivision shall be made by the city engineer to insure conformity with approved plans and specifications. The subdivider shall notify the city engineer when each phase is ready for inspection. 1. Application procedure. Within 12 months following approval of the preliminary plat, the applicant shall file with the code compliance officer an application for final plat, which shall conform to the preliminary plat in all ways. It may represent only that portion of the subdivision which the subdivider proposes to develop at this time. Failure to submit within this time period shall void the plat unless an extension not to exceed 12 months is granted by the city. Said extension must be applied for in writing. 2. Water and sewer. If water or sewer requires approval of the county, department of public health, and/or EPD or other agency, this shall accompany the application for approval of final plat. Sewer or wastewater approval shall be in accordance with section 38-2 of this Code. 3. As-built data. As-built data drawings are to be submitted to the code compliance officer and then provided to the city engineer (for streets and drainage) and to the county utilities director (for water and sewer) as part of an application for final plat approval. 4. Content. The final plat submitted shall be prepared per accepted professional standards, and must meet all the requirements of a preliminary plat plus the following: a. Date of survey, date of plat drawing, and revision dates, graphic scale, north point, notation as to the reference or bearings to magnetic, true north or grid north, an indication whether bearings shown are calculated from angles turned or taken from compass readings, the longitude and latitude and state plane coordinates; and the mean sea level datum. b. If part or all of the tract is a portion of a former subdivision, reference shall be made to the former plat, with identification of the former lots and block being resubdivided and including the name of the former subdivision. c. Municipal, county or land lot lines accurately tied to the boundary line by distance and angles, when such lines transverse or are reasonably close to the subdivision, and boundary line of the subdivision by distance and angles. d. Location, right-of-way, widths, and names of all streets and alleys within and adjoining the plat, and the location and widths of all cross angles of intersections, radii, length of tangents, and arcs and degree of curvature with basis of curve data. e. Lot lines with dimensions to the nearest one hundredth foot, necessary internal angles, arcs and chords, and tangents of radii of rounded corners. f. Building setback lines with dimensions and front yard setback lines with dimension. g. When lots are on a curve or side lot lines are at angles other than 90 degrees, the lot width at the building lines shall be shown. h. Location, dimensions and purpose of all drainage structures and any easement, including slope easements, and public service utility right-of-way lines, and any areas to be reserved, donated, or dedicated to public use or sites for other use with notes stating their purpose; and of any areas to reserve by deed covenant for use of all property owners. i. Accurate location, material and description of monuments and markers. Monuments to be placed after final street improvements shall be designated as "future." j. A statement as follows: "This plat is subject to the covenants set forth in the separate document(s) attached hereto dated , which hereby becomes a part of this plat, recorded and signed by the owner." k. Certification for final plat approval by the city. l. Owner's certification: The final plat shall contain, in addition to a licensed land surveyor's certification, a statement as follows: "I (we) hereby certify that I am (we are) the owner(s) of the property shown and described hereon and that I (we) hereby adopt this plan of subdivision with my (our) free consent, establish the minimum building restriction lines, dedicate all streets, easements, alleys, walks, parks and other open spaces to provide directly or indirectly for maintenance of all common areas or outlets." This statement shall be signed and dated by the owners, proprietors, or trustees, if any, prior to the final plat submittal. The final plat shall be accompanied by statement of deed restrictions (covenants) which the subdivider intends to apply to the subdivision, if any. All deed restrictions shall meet or exceed the requirements contained in this regulation and the requirements of the zoning ordinance. m. Be accompanied by all formal irrevocable offers of dedication to the public of all streets, public uses, utilities, parks, and easements, in a form approved by the city attorney; and the subdivision plat shall be marked with a notation indicating the formal offers of dedication as follows: "The owner, or his representative, hereby irrevocably offers for dedication to the City all the streets, public uses, easements, parks, and required utilities shown on the subdivision plat and construction plans per an irrevocable offer of dedication dated , and recorded in the Clerk's Office of the County Superior Court, as appropriate. BY: DATE: (Owner or Representative) The applicant shall deliver a full covenant and warranty deed to all dedicated lands and improvements in proper form for recording, together with a title policy to Watkinsville in the sum which shall be reasonably determined by council resolution before signing the final subdivision plat. n. Notation of approval as follows: i. An engineer's or surveyor's certification, directly on the final plat as follows: "It is hereby certified that this plat is true and correct and was prepared from an actual survey of the property by me or under my supervision; that all monuments shown hereon actually exist or are marked 'future' and their location, size, type, and material are correctly shown; and that all engineering requirements of the Subdivision Regulations the City of Watkinsville, have been fully complied with." BY: Registered Certified Engineer #: BY: Registered Georgia Land Surveyor #: ii. An owner's certification, directly on the final plat as follows: Owner's Certification: State of Georgia, City of Watkinsville "The owner of the land shown on this plat and whose name is subscribed hereto, in person or through a duly authorized agent, certifies that this plat was made from an actual survey, that all state, county and city taxes or other assessments now due on this land have been paid. AGENT: DATE: OWNER: DATE: iii. Certification of individual private water and/or sewer system directly on the final plat as follows: "I certify that the individual private sewerage collection and disposal system and the individual private water supply and distribution systems installed or to be installed and/or the plans for the private sewage meet the requirements of the health department. LOT #(s) Is (are) not approved for private sewage systems DATE: HEALTH OFFICER iv. Certification of community or public water system, directly on the final plat as follows: "I hereby certify that the community or public water supply and distribution systems are to be installed, shown in the subdivision plat attached hereto, meet the requirements of the Georgia Department of Natural Resources water supply section. LOT #(s) Is (are) not approved for community or public water systems Georgia DNR Water Supply Section DATE: v. Certification of community or public sewer systems, directly on the final plat as follows: "I hereby certify that the community or public sewerage collection and disposal system installed or to be installed, shown in the subdivision plat attached hereto, meets the requirements of the, meets the requirements of the Georgia Department of Natural Resources Water Quality Control Section. LOT #(s) Is (are) not approved for community or public water systems Georgia DNR Water Supply Section DATE: o. Be accompanied by the subdivision improvement agreement and security, if required, in a form reasonably satisfactory to the city attorney and in an amount established by the city upon recommendation of the city engineer and shall include a provision that the subdivider shall comply with all the terms of the resolution of final subdivision plat approval as determined by the city and shall include, but not be limited to, the performance of all required subdivision and off-site improvements, and that all improvements and land in the irrevocable offer of dedication shall be dedicated to the city free and clear of all liens and encumbrances on the premises. p. Be accompanied by a fee as determined by council resolution for each street sign shown in the construction plans, which street signs shall be installed by the city. 5. Other requirements. Title opinion from developer's attorney certifying clear title to all streets, rights-of-way, drainage easements, well lots, wells, and other areas to be dedicated to the city or county, and dedication deeds or easement agreements. Surety documents in a form acceptable to the city attorney, as may be required herein, or by other ordinances of the city. 6. Further conditions. No final plat shall be approved, or accepted for recordation by the clerk of the superior court, until: 1) All public improvements shall have been properly installed and completed per all requirements hereof and all applicable city regulations (other than traffic signs, street name signs, and signalization), and a registered engineer, land surveyor, or landscape architect's report certifies that all improvements meet the requirements hereof and all applicable city regulations, and as-built data drawings of the improvements shall have been approved by the city engineer; or 2) the city has received performance security outlined below. 7. Contract. In cases of security in lieu of completion at time of final plat, there shall be a non-revocable and executed contract for installation of the improvements between the developer and a qualified contractor. The city shall require the applicant to indicate on the plat all roads and public utility improvements which shall be required to be established or extended, and any other special requirements deemed necessary by the city in order to conform the plat to the comprehensive plan. The executed contract shall call for completion of the improvements within 24 months of approval of the final plat. however, the city may in its discretion require that all public improvements be installed and dedicated prior to the signing of the final plat by the mayor and city engineer. 8. Subdivision improvement guarantee. a. Waiver in city discretion. The mayor and council at its sole discretion may waive the requirement that the applicant complete and dedicate all public improvements prior to approval of the final plat and, as an alternative, permit the applicant to enter into a subdivision improvement agreement by which the subdivider covenants to complete all required public improvements no later than two years following the date the mayor signs the final plat. The applicant shall covenant to maintain each required public improvement for two years following acceptance of the dedication and also shall warrant that all required public improvements will be free from defect for two years following the acceptance. The agreement shall provide that the covenants shall run with the land and bind all successors, heirs, and assigns. The agreement will be adopted by the city and shall be recorded in the clerk's office of the county superior court. b. Security. When the city permits an applicant to enter into a subdivision improvement agreement, it shall require the applicant to provide a bond or letter of credit or cash escrow as security for the promises contained in the subdivision improvement agreement. Such security shall be in an amount equal to 120 percent of the estimated cost of completion of the required public improvements, including lot improvements. The issuer of the bond or letter of credit or the escrow agent, as applicable, shall be subject to approval of the city. c. Bond or letter of credit. If the applicant posts a bond or letter of credit as security for the promises contained in the subdivision improvement agreement, it shall: (1) Be irrevocable; (2) Be for a term sufficient to cover the completion, maintenance and warranty periods above; and (3) Require only that the government present the bond or credit with a sight draft and an affidavit signed by the city attorney attesting to the city's right to draw funds thereunder. d. Cash escrow. If the applicant posts a cash escrow as security for its promises contained in the subdivision improvement agreement, the escrow instructions shall provide: (1) That the subdivider will have no right to return of any of the funds except in compliance herewith; and (2) That the escrow agent shall have a legal duty to deliver the funds to the city whenever the city attorney presents an affidavit to the agent attesting to the city's right to receive funds whether or not the subdivider protests that right. e. Reduction. If/when the city accepts the dedication for the last completed required public improvement, the city shall execute a waiver of its right to receive all but 25 percent of the funds if the subdivider is not in breach of the subdivision improvement agreement. The residual funds shall be security for the subdivider's covenant to maintain the required public improvements and its warranty that the improvements are free from defect. f. Costs of improvements. All required improvements shall be made by the developer, at his/her expense, without reimbursement. g. Failure to complete improvement. Where required public improvements have not been installed within the terms of the agreement, the city may then: (1) Declare the agreement to be in default and require that all the improvements be installed regardless of the extent of the building development at the time the agreement is declared to be in default; (2) Suspend final subdivision plat approval until the improvements are completed and record a document to that effect for the purpose of public notice; (3) Obtain funds under the security and complete improvements itself or through a third party; (4) Assign its right to receive funds under the security to any third party, including a subsequent owner of the subdivision for which improvements were not constructed, in whole or in part, in exchange for that subsequent owners promise to complete improvements in the subdivision; (5) Exercise any other rights available under the law. h. Acceptance of dedication offers. Acceptance of formal offers of dedication of streets, public areas, easements, and parks shall be by ordinance of the governing body. The approval of a subdivision plat by the city, whether sketch, preliminary or final, shall not be deemed to constitute or imply the acceptance by the city of any street, easement, or park shown on the plat. 9. Maintenance of improvements. The developer shall in all cases be required to maintain all required public improvements on the individual subdivided lots until acceptance of the improvements by the city. If there are any certificates of occupancy on a street not dedicated to the city, the city may affect emergency repairs and charge those costs to the developer. Following the acceptance, the subdivider shall maintain the improvements for two years from the date of acceptance. 10. Review and approval process including public hearing. The mayor, city manager, city engineer, and city attorney will undertake a review and approval process per the same requirements and standards for preliminary plat approval found in sections 3.2 and 3.4, but excluding the review and approval by all involved entities such as the council. 11. Changes to an approved final plat. No change shall be made on a plat or on accompanying data sheets after approval, unless authorization for such changes has been granted in writing by a review and approval process per the same procedures and requirements and standards for preliminary plat approval found in sections 3.2 and 3.4, including the review and approval by all involved entities including the city manager, city engineer, and the mayor and council per a public hearing. 12. Recording. Subsequent to any favorable decision by the city, applicant shall file a copy of the final plat with the clerk of the county superior court, and a copy of the final plat and construction plans with the city clerk. An approved final plat shall be filed with each clerk within 30 days after final approval. Failure to comply with this provision shall void any approved plat. 13. Copies of the recorded final plat. Two print shall be submitted to the city clerk with other required materials comprising the final plat. After approval, one print shall be returned to the developer. 14. Disapproval of a final plat. If the final plat does not conform to the preliminary plat, a notation of the action shall be made on all prints of the final plat, including a statement of the reasons thereof. Applicant shall make such changes as are necessary to conform the final plat to the preliminary plat and the construction plans. Alternatively, the applicant may appeal any denial pursuant to the procedures of section 1.10.