--- title: Watkinsville Zoning Ordinance, Sec. 4.1. General requirements collection: local-codes id: local-code:watkinsville/zoning/4.1 cite_as: Watkinsville, Ga., Zoning Ordinance § 4.1 canonical_url: https://georgiacommons.org/code/local/watkinsville/zoning/4.1 md_url: https://georgiacommons.org/code/local/watkinsville/zoning/4.1.md text_url: https://georgiacommons.org/code/local/watkinsville/zoning/4.1/text source_url: https://library.municode.com/ga/watkinsville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:watkinsville jurisdiction_name: Watkinsville place_fips: "1380788" corpus_version: local-codes-watkinsville-c567989ba790 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/watkinsville/zoning/~appendix-b/~article-4.md previous: https://georgiacommons.org/code/local/watkinsville/zoning/3.7.md next: https://georgiacommons.org/code/local/watkinsville/zoning/4.2.md index: https://georgiacommons.org/code/local/watkinsville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:watkinsville/zoning/4.1@2026-11-11-58d1d2bd04 --- # Watkinsville Zoning Ordinance, Sec. 4.1. General requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SIGN ORDINANCE § 13[12] / Article 4 - DEVELOPMENT CONSTRUCTION APPROVAL Land-disturbing activity shall not commence until: 1) the application, and 2) the construction plans, are approved by the city engineer and mayor and council, and a development permit is issued by the city manager or his/her designee. A development permit is required for all development activity, including clearing and grubbing, grading and the construction of such improvements as streets, surface parking areas and drives, stormwater drainage facilities, sidewalks, water or sewerage utilities, or other structures, except for buildings, signs, or other structures requiring a building permit. Periodic inspection shall be made by the city engineer and/or city manager or his/her designee to insure conformity with the approved plans and specifications. The subdivider shall notify the code compliance officer when each phase is ready for inspection.