1. Approval requirements.
a. No development permit may be approved unless in compliance with applicable wetlands regulations.
b. For any wetland under the jurisdiction of the U.S. Corps of Engineers, a copy of the authorization by the Corps of Engineers shall be attached to the application.
2. Wetlands protection site plan requirements. Applications for a development permit in the wetland protection area shall include a wetlands protection site plan, at a scale of 1" = 50', with the following information:
a. A map of all planned excavation and fill, including calculations of the volume of cut and fill, and cross-sectional drawings with elevations, horizontal scale, vertical scale showing existing and proposed grades.
b. Location, dimensions and area of all impervious surfaces, existing and proposed, on the site and adjacent to the site for 200 feet.
c. The orientation and distance from the proposed site to the nearest bank of an affected perennial stream or water body.
d. Elevations at contour intervals no greater than two feet of the site and land within 200 feet.
e. Location and detailed design of any spill and leak collection systems for containing accidentally released hazardous or toxic materials.
f. All proposed temporary disruptions or diversions of local hydrology.
3. Activities to comply with site plan. All development or site work shall conform to said site plan. The site plan may be amended only with the written approval of the city or its designee. the city may require a bond with surety and conditions sufficient to secure compliance with the permit. In a breach of condition of any such bond, the city or its designee may collect such bond or sue upon such bond.
4. Filing fee. Applicant shall pay a filing fee established by council resolution.
5. Review procedures. The application shall be made to the code compliance officer and will be reviewed by the city engineer within 60 days or per established review procedures for the type of development being considered, whichever is greater. The review period shall include the preparation of findings (approval or disapproval) by the city engineer, after review by the city manager, and written notification of findings to the applicant.
6. Duration of permit validity.
a. If construction described in the development permit has not commenced within 12 months from issuance, the permit expires. Provided, however, for good cause shown, upon written application from the applicant, the mayor and council may extend the deadline for an additional 12 months.
b. If construction is suspended or abandoned, the permit expires 12 months after work ceased.