Watkinsville · Zoning Ordinance
Appendix B - SIGN ORDINANCE § 13[12] / Article 5 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division I - PROJECT DESIGN
Sec. 5.16. Utilities.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
1. Utilities required. Except for minor subdivisions otherwise exempt from the construction of utilities, the improvements listed below are required. Where installed upon property within the city at the time of construction, all such improvements shall be dedicated and conveyed or transferred to and the title shall vest in the city unless otherwise indicated on the recorded plat of subdivision. Nothing contained in this section is in any way intended to affect matter of litigation pending between the city and/or their agencies at the time of enactment of these regulations before courts of competent jurisdiction relating to the ownership of improvements required by this section.
a. Developer shall provide sanitary sewer or septic capacity, fire protection lines and necessary flows for the project as required by applicable codes. Said capacity shall be demonstrated to the satisfaction of the utilities department in accordance with established codes prior to issuance of land disturbance and building permits.
b. Developer shall be responsible for providing and paying for necessary water and sewer extensions including the addition of necessary capacity required to serve the development.
2. Water supply.
a. Water supply and/or distribution system in accordance with the "Oconee County Water and Wastewater Standards," which is incorporated herein by reference, or other such documents as adopted by the Oconee County Board of Commissioners.
b. All potable water systems shall be subject to applicable current "Rules for Safe Drinking Water:
Chapter 391-3-5, Revised June 1989 or most recent revision, Georgia Environmental Protection Division" and applicable city and county regulations, policies, and construction standards.
c. Public water service shall be provided to every lot in every subdivision and to every development for both domestic use and fire protection if public water is available or under bid or contract to be available within 1,000 feet of the subdivision or development.
3. Fire hydrants.
a. Fire hydrants are required in all subdivisions and development projects served by a public water system.
b. Fire hydrant spacing shall be in accordance with the water system specifications of Oconee County, which are incorporated herein by reference. Placement of fire hydrants is subject to approval by the Oconee County Fire Department and Utility Department.
c. Fire hydrants as specified by the Oconee County Fire Department shall be located every 500 feet or at every intersection, whichever is closer.
4. Sanitary sewage disposal.
a. Sanitary sewer system with service connection to the property line for each parcel and lot; except in cases where septic tanks are approved by the city and the county health department.
b. The provisions of this paragraph are further subject to any sewer or wastewater use priority policies adopted by the city and the Oconee County Board of Commissioners from time to time.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.