1. Location of utilities in streets. a. Utility lines shall be located in accordance with the street cross sections contained herein, or at such other locations as may be approved by the city and Oconee County. Any underground utilities shall be installed with the surface having the same compaction as that of the paved way and marked on the plat to indicate the location of the underground utilities. b. The subdivider shall install sewer mains, sewer laterals, water mains and services extended to the property line of each lot, in accordance with accepted engineering practices, the approved subdivision construction plans, and the Oconee County Utility Department Water and Wastewater Standards, which are incorporated herein by reference. c. In cases where public water and sewer services are not available, the minimum lot sizes shall conform to those set forth in these regulations and other applicable city regulations. d. Design criteria for storm drain facilities shall conform to accepted engineering practices and guidance documents. Pipe materials shall conform to all criteria set forth in the erosion control and stormwater management regulations of the city and other applicable regulations. e. Site lighting shall be oriented to the interior of the site so as not to impose glare or objectionable light levels on the neighboring residential property. f. Water mains for both domestic use and fire protection shall be properly connected with the public water system, or with an alternate water supply approved by the city and county and Georgia EPD. The lines shall be constructed in such a manner as to adequately serve all lots shown on the subdivision plat. The lines shall be installed in conformance with the Oconee County Utility Department Water and Wastewater Standards. The county will require network distribution analysis of the water distribution system for any development that the peak hour water demand is equal to or exceeds 50 gpm. g. Above-ground utilities. All fire hydrants, utility poles, street lights, transformer boxes and pedestals, and other public or private utility structures placed above ground within a public street right-of-way or private street easement must be at least six feet back from the back of the street curb (or edge of pavement). h. Underground utilities. (1) All electric, telephone, cable TV and other wires shall be placed underground in any major subdivision, and in any multi-family or nonresidential development. (2) Utilities placed underground within a public street right-of-way or private street easement shall be located as shown on the utility location cross-sections in these regulations, above. Where no public or private street exists or is proposed (such as in a shopping center), utilities shall be placed in accordance with the development plans as approved by the city. (3) The right-of-way is to be cleared and rough graded the full width prior to any utility installation. (4) Underground utilities including sewer services, all water lines and any cable conduits under the pavement shall be placed in the ground before the base material is in place, or the pipes shall be bored if installed after street construction. (5) All trenches shall be thoroughly compacted in six-inch layers with mechanical compacting equipment. (6) The facilities for underground utilities such as sewer, water, and gas, including sewer and water laterals to each lot line when laid in streets, shall be in place prior to surfacing of streets. All facilities for utilities shall be placed in easements provided for that purpose in the subdivision. (7) Any disturbance or construction in the completed (seeded and/or sodded) right-of-way by a public utility such as power, gas, phone and cable must be repaired or replaced with the specified materials as called for in the initial improvements. 2. Pavement cuts. a. If utility services are installed after the streets have been paved (i.e., under existing streets), such utility services shall be installed by boring under the street. Note that this applies only to services and not the distribution system in the development. b. When it is necessary for a subdivider or any utility company to break existing base or pavement for the installation of services, or any other purpose, the subdivider or utility company shall be financially responsible for the repair of the pavement. The pavement shall be repaired with a patch in accordance with standards developed by the city engineer, and in accordance with all other specifications required herein for construction of streets. (1) No existing city or county road can be open cut unless unusual circumstances warrant it. All utility construction plans within the city or county rights-of-way shall be reviewed and approved by the appropriate city and/or county offices. (2) If a pavement cut is approved, all trenches shall be backfilled and compacted the same day the trench is opened. Trenches under the paving shall be returned to 95 percent compaction. The backfill in all such ditches will be thoroughly compacted in six-inch lifts, the subgrade shall be brought to the lines, grades, and typical roadway section required by city specifications.