1. Building permit required. a. No construction activity of any kind including grading, installation of improvements, and building shall begin on any subdivision lot or site development project without the prior approval by the city engineer and issuance of a building permit by the code compliance officer. b. The code compliance officer shall not issue any permit for the erection of any building or structure to be located in any subdivision, a plat whereof is required to be recorded pursuant to the provisions of these regulations, until such plat shall have been admitted to record as provided for in these regulations. 2. Building site development. Development and building construction on an individual subdivision lot (such as a single-family detached home) or development project site (such as a nonresidential building or multi-family project) shall be in accordance with the Grading and Draining of Individual Building Sites Section of the Erosion Control and Stormwater Management Article of these regulations. 3. Soil preservation, grading, and seeding. a. Soil preservation and final grading. No certificate of occupancy shall be issued until final grading has been completed and the lot pre-covered with soil with an average depth of at least six inches which shall contain no particles more than two inches in diameter over the entire area of the lot, except that portion covered by buildings or included in streets, or where the grade has not been changed or natural vegetation seriously damaged. Topsoil shall not be removed from residential lots or used as spoil, but shall be redistributed so as to provide as least six inches of cover on the lots and at least four inches of cover between the sidewalks and curbs, and shall be stabilized by seeding or planting. b. Lot drainage. Lots shall be laid out so as to provide positive drainage away from all buildings, and individual lot drainage shall be coordinated with the general storm drainage pattern for the area. Drainage shall be designed so as to avoid concentration of storm drainage water from each lot to adjacent lots. c. Lawn grass seed and sod. Sod or any approved grass seed may be used to comply with any requirements of seeding set forth herein. Lawn grass seed shall be sown at not less than four pounds to each 1,000 square feet of land area. In the spring, the seed shall be sown between March 15 and May 15; and in the fall, the seed shall be sown between August 15 and September 30. All seed shall have been tested for germination within one year of the date of seeding, and the date of testing shall be on the label containing the seed analysis. All lots shall be seeded from the roadside edge of the unpaved right-of-way back to a distance of 25 feet behind the principal residence on the lot except for any portion left in an unaltered state. No certificate of occupancy shall be issued until re-spreading of soil and seeding of lawn has been completed; except that between October 1 and March 15, and between May 15 and August 15, the applicant shall submit an agreement in writing signed by the developer and the property owner, with a copy to the building inspector, that re-spreading of soil and seeding of lawn will be done during the immediate following planting season as set for in the ordinance, and leave a cash escrow for performance in an amount determined by the city manager or his/her designee. 4. Debris and waste. No cut trees, timber, debris, earth, rocks, stones, soil, junk, rubbish, or other waste materials of any kind shall be buried in any land, or left or deposited on any lot or street at the time of the issuance of a certificate of occupancy, and removal of those items and materials shall be required prior to issuance of any certificate of occupancy on a subdivision. No items and materials as described in the preceding sentence shall be left or deposited in any area of the subdivision at the time of expiration of any subdivision improvement agreement or dedication of public improvements, whichever is sooner. 5. Subdivision improvement agreement and security to include lot improvement. The applicant shall enter into a separate subdivision improvement agreement secured by a letter of credit or cash escrow to guarantee completion of all lot improvement requirements including but not limited to, soil preservation, final grading, lot drainage, lawn grass seeding, removal of debris and waste, fencing, and all other lot improvements required by the city. Whether or not a certificate of occupancy has been issued, the city may enforce the provision of the subdivision improvement agreement where the provision of this section or any other applicable law, ordinance, or regulation have not been met. 6. Certificate of occupancy required. a. No dwelling within the city may be occupied for dwelling purposes until all required utility installations, including the water supply and sanitary sewer systems, have been completed to the satisfaction of the county health office and the city manager or his/her designee. b. No principal building of any kind, and no accessory building requiring issuance of a building permit, shall be occupied or used for any purpose until a certificate of occupancy has been issued, as authorized by the fire marshal (if required) and the code compliance officer.