1. Survey monuments required. Documentation of monuments established by land survey is required. Such documentation must be consistent with requirements for both the Georgia Maps and Plats Act (O.C.G.A. ยง 15-6-67) and under these regulations. Monuments shall be indicated on plats to be recorded with the clerk of the superior court. All such monuments shall be properly set in the ground and approved by a registered land surveyor prior to final plat approval. Removal of monuments and resetting by anyone other than a registered land surveyor is prohibited. 2. Exterior development boundaries. A minimum of two GPS/GIS monuments shall be installed. GPS/GIS monuments shall provide latitude, longitude, and elevation referenced to mean sea level. GPS/GIS monuments shall be four-inch by four-inch concrete with brass cap, one foot above the surrounding ground elevation. 3. Lot and street corners. Permanent reference monuments shall be placed at property corners and other points such as points of curvature and tangent points. All monuments shall be marked with a solid iron rod or an iron pipe not less than one-half inch in diameter, at least two feet long, driven flush with the ground. 4. Floodplain elevations. On developments containing floodplains, flood elevation references shall be set and referenced. Base flood elevations shall be shown on final plats per FEMA regulations.