--- title: Waynesboro Zoning Ordinance, 15-5.2 collection: local-codes id: local-code:waynesboro/zoning/15-5.2 cite_as: Waynesboro, Ga., Zoning Ordinance § 15-5.2 canonical_url: https://georgiacommons.org/code/local/waynesboro/zoning/15-5.2 md_url: https://georgiacommons.org/code/local/waynesboro/zoning/15-5.2.md text_url: https://georgiacommons.org/code/local/waynesboro/zoning/15-5.2/text source_url: https://www.waynesboroga.com/DocumentCenter/View/54 date: 2026-11-14 status: active jurisdiction: city:waynesboro jurisdiction_name: Waynesboro place_fips: "1380984" corpus_version: local-codes-waynesboro-af7691115d34 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/waynesboro/zoning/~article-15.md previous: https://georgiacommons.org/code/local/waynesboro/zoning/15-5.1.md next: https://georgiacommons.org/code/local/waynesboro/zoning/15-5.3.md index: https://georgiacommons.org/code/local/waynesboro.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:waynesboro/zoning/15-5.2@2026-11-14-982b282438 --- # Waynesboro Zoning Ordinance, 15-5.2 > As posted on the city's website, retrieved 2026-11-14 > Read by OCR from a scanned page: a character, a name, or a number may be misread. Part of: Article 15 - FLOOD HAZARD AREAS, DRAINAGE AND STORM WATER / 15-5 - Administration The Building Inspector is appointed to administer and implement this Article by granting or denying building permit applications in accordance with its provisions, Duties of the Building Inspector shall include, but not be limited to, the following: a) b) Review all building permits to determine that the permit requirements of this Article have been satisfied; Advise permittee that additional federal or state permits may be required, and if specified federal or state permits are known, require that copies of such permits be provided and maintained on file with the building permit; Review all buildings to determine if proposed development adversely affects the flood-carrying capacity of the flood plain. For purposes of this Article, “adversely affects’ means damage to adjacent properties because of rises in flood stage attributed to physical changes of the channel and the adjacent overbank areas; 1) Ifit is determined that there is no adverse effect, and the development is not a building, then the permit shall be granted without further consideration; 2) It is determined that there is an adverse effect, then technical justification (i.e., a registered professional engineering analysis) for the proposed development shall be required; and 3) Ifthe proposed development is a building, then the provisions of this Article shall apply.