In all areas of special flood hazard, the following provisions are required: a) All new construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure. b) All mobile homes shall be anchored to resist flotation, collapse or lateral movement by providing over-the-top ties to ground anchors. Cc) Specific requirement shall be that: 1) Over-the-top ties be provided at each of the four corners of the mobile home, with no additional ties per side at intermediate locations and mobile homes less than 50 feet long requiring one additional tie per side. 2) Frame ties be provided at each corner of the home with five additional ties per side at intermediate points and mobile homes less than 50 feet long requiring four additional ties per side. 3) All components of the anchoring system be capable of carrying a force of 4,800 pounds. 4) Any additions to the mobile home be similarly anchored. d) g) h) j) k) 1) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage. All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damage. All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters. On-site waste disposal system shall be located to avoid impairment to them or contamination from them during flooding. All subdivision proposals shall be consistent with the need to minimize flood damage. All subdivision proposals shall have public utilities and facilities such as sewer, gas, electric and water systems located and constructed to minimize flood damage. All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards. Base flood elevation data shall be provided for subdivision proposals and other proposed development which is greater than the lesser of 50 lots or 5 acres. The cumulative effect of any proposed development shall not adversely affect the area of special flood hazard. This determination is to be made in accordance with Section 15-5.1 (c). Further Requirements In all areas of special flood hazard where base flood elevation data has been provided as set forth in Section 15-5.3, the following provisions are required: 15-7.1 New construction or substantial improvement of any residential structure (including mobile home) shall have the lowest floor, including basement, elevated to or above base flood elevation. New construction or substantial improvement of any commercial, industrial or other non-residential structure (including mobile homes) shall either have the lowest floor, including basement, elevated to the level of the base flood elevation or, together with attendant utility and sanitary facilities, be flood-proof so that below the base flood level the structure is water tight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy. A registered professional engineer or architect shall certify that the standards of this sub-section are satisfied. Such certification shall be provided to the official as set forth in Section 15-5.1 (c).