--- title: Waynesboro Zoning Ordinance, 18-3.4 collection: local-codes id: local-code:waynesboro/zoning/18-3.4 cite_as: Waynesboro, Ga., Zoning Ordinance ยง 18-3.4 canonical_url: https://georgiacommons.org/code/local/waynesboro/zoning/18-3.4 md_url: https://georgiacommons.org/code/local/waynesboro/zoning/18-3.4.md text_url: https://georgiacommons.org/code/local/waynesboro/zoning/18-3.4/text source_url: https://www.waynesboroga.com/DocumentCenter/View/54 date: 2026-11-14 status: active jurisdiction: city:waynesboro jurisdiction_name: Waynesboro place_fips: "1380984" corpus_version: local-codes-waynesboro-af7691115d34 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/waynesboro/zoning/~article-18.md previous: https://georgiacommons.org/code/local/waynesboro/zoning/18-3.3.md next: https://georgiacommons.org/code/local/waynesboro/zoning/18-4.md index: https://georgiacommons.org/code/local/waynesboro.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:waynesboro/zoning/18-3.4@2026-11-14-ee7d16e163 --- # Waynesboro Zoning Ordinance, 18-3.4 > As posted on the city's website, retrieved 2026-11-14 > Read by OCR from a scanned page: a character, a name, or a number may be misread. Part of: Article 18 - ADMINISTRATION, ENFORCEMENT AND PENALTIES Before commencing either excavation or construction, the building permit (or copy thereof) shall be placed conspicuously on the front property line therein described for the duration of the excavation or construction and in such a way that it is protected from the weather.