Where a proposed development is traversed by a watercourse, drainageway, channel or stream, there shall be provided a stormwater or drainage easement of minimum 20 feet in width. Easements for storm pipes shall be at least ten feet wide, and all easements shall be provided for all drainage facilities in accordance with the Georgia Stormwater Management Manual and approved by the director of public works. All proposed developments within this district shall be designed in accordance with stormwater management standards in the Georgia Stormwater Management Manual. In addition, to the design and installation [of] stormwater management facilities, the developer shall provide a longterm maintenance plan for such facilities, including designating longterm responsibility for the management and maintenance of the stormwater facilities.