A great deal of environmental damage associated with new development can be avoided if construction and the position of the development site are well planned. As the most potentially destructive part of the construction process, grading must be carefully planned and executed to maintain the stability of protected mountain and hillside property. The choice of an appropriate building site is the key to minimizing potential erosion problems. Grading, if required on the site, shall not take place prior to site plan approval and issuance of any permit required by the county soil erosion and sedimentation control resolution. Only areas which have been approved for disturbance may be disturbed, and then only after all erosion measures and other regulations have been met. The applicant's plans for meeting the following standards will be reviewed during planning or before construction begins: (1) Cut and fill activities may be minimized by carefully selecting the site for structures, drainfields, septic tanks, etc. (2) Grading areas should be clearly marked before any grading begins. Highly visible fencing is recommended to prohibit earthmoving equipment from moving beyond designated grading boundaries. (3) Cut slope and fill slopes of steeper than 2:1 slope ratio will only be considered if shown to provide for more effective environmental protection while still being permanently stabilized with rock or other approved stabilization method. Alternative measures such as retaining walls of limited height may be used. (4) Grading should be phased so that prompt re-vegetation will provide optimal erosion controls. (5) All top and bottom edges of slopes caused by either cut or fill should be a minimum of two feet away from property lines.