--- title: White County Zoning Ordinance, Section 903. Special use permit collection: local-codes id: local-code:white-county/zoning/903 cite_as: White County, Ga., Zoning Ordinance § 903 canonical_url: https://georgiacommons.org/code/local/white-county/zoning/903 md_url: https://georgiacommons.org/code/local/white-county/zoning/903.md text_url: https://georgiacommons.org/code/local/white-county/zoning/903/text source_url: https://library.municode.com/ga/white_county/codes/code_of_ordinances date: 2026-06-08 status: active jurisdiction: county:white jurisdiction_name: White County county_fips: "13311" corpus_version: local-codes-white-county-30581b2aa62e publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/white-county/zoning/~appendix-c/~article-ix.md previous: https://georgiacommons.org/code/local/white-county/zoning/902.md next: https://georgiacommons.org/code/local/white-county/zoning/904.md index: https://georgiacommons.org/code/local/white-county.md branch: zoning edition: As published by Municode, current through 2026-06-08 edition_date_kind: current_through source_publisher: Municode version_id: local-code:white-county/zoning/903@2026-06-08-4bfe91f7d5 --- # White County Zoning Ordinance, Section 903. Special use permit > As published by Municode, current through 2026-06-08 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - LAND USE REGULATIONS / Article IX - AGRICULTURE FORESTRY DISTRICT, A-1 1. Amusement parks, related attractions and performance entertainment facilities. 2. Animal mills or pet breeding facilities. 3. Auto or motorsports tracks or related facilities. 4. Meat processing and slaughter yards. 5. Rooming, boarding or group housing, and group recovery/homes/centers. 6. Shooting ranges (outdoor or indoor). 7. Substance abuse and treatment facilities. 8. Solar energy farms— ground mounted solar energy systems between 10 and 50 acres, requirements include a site plan to include topography that includes 20-foot setbacks from all rights-of-way and 50-foot setbacks from all residential structures, and a visual buffer plan to include berms, trees, vegetation and fencing. A land disturbance plan will also be required. Maximum height of any structure is 25-feet high. A decommissioning plan will also be required to include removal of all structures, components and non-utility owned equipment within 1 year of the end of operations, and a restoration plan to return the property to pre-construction conditions. Commercial general liability insurance is required through the life-cycle of the farm. There must be a 200-foot setback/buffer between solar farms. ## History (Res. No. 2019-09, 6-4-19; Res. No. 2025-23, 11-24-25)