1. Amusement parks, related attractions and performance entertainment facilities. 2. Animal mills or pet breeding facilities. 3. Auto or motorsports tracks or related facilities. 4. Meat processing and slaughter yards. 5. Rooming, boarding or group housing, and group recovery/homes/centers. 6. Shooting ranges (outdoor or indoor). 7. Substance abuse and treatment facilities. 8. Solar energy farms— ground mounted solar energy systems between 10 and 50 acres, requirements include a site plan to include topography that includes 20-foot setbacks from all rights-of-way and 50-foot setbacks from all residential structures, and a visual buffer plan to include berms, trees, vegetation and fencing. A land disturbance plan will also be required. Maximum height of any structure is 25-feet high. A decommissioning plan will also be required to include removal of all structures, components and non-utility owned equipment within 1 year of the end of operations, and a restoration plan to return the property to pre-construction conditions. Commercial general liability insurance is required through the life-cycle of the farm. There must be a 200-foot setback/buffer between solar farms.