(a) All forms of development within the watershed protection overlay shall be required to have a site plan submitted and approved according to this section before any rezoning requests or building permits may be approved or any land-disturbing activity may take place. Each site plan submitted shall include the following: (1) A site plan drawn to scale and showing all planned improvements, including width, depth, and length of all existing and proposed structures, roads, water courses, drainage ways, water, wastewater, and stormwater facilities, and utility installations. (2) Location, dimensions, and area of all impervious surfaces, both existing and proposed, on the site. (3) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or body of water. (4) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet. (5) Grading plan. (6) Erosion and sedimentation control plan. (7) Any commercial or industrial facility for which new construction or expansion of an existing facility is planned shall provide location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic waste. (b) Exemptions from site plan requirement. The following are exemptions to the site plan requirements, provided they are not non-conforming uses: (1) Repairs to a facility that is part of a previously approved and permitted development. (2) Construction of minor structures such as sheds, or additions to single-family residences.