Development plans including site grading and drainage plans should be developed to minimize disruption of natural drainage patterns on properties as well as to minimize impacts to downstream drainage infrastructure and structures. Whenever a hydrologic and hydraulic report (as defined in section 8 of this document) indicates a potentially adverse impact resulting from development of a property on a downstream property, that project shall incorporate stormwater detention facilities to reduce the discharge rate. The meaning of adverse impact shall apply to situations where the post development discharge rates, up to and including the 100-year storm event, exceed those determined for the pre-developed conditions. Additionally, no increases in stormwater runoff rates shall be allowed at any discharge point from the site unless approved by the county engineer. The baseline or pre-developed conditions shall be on an analysis of the existing conditions taking into account existing land use, stormwater management controls and other factors that can affect the hydrologic responsiveness of the site. Proposed developments shall be analyzed for the following storm events: • 1-year 24-hour Design Storm. • 2-year 24-hour Design Storm. • 5-year 24-hour Design Storm. • 10-year 24-hour Design Storm. • 25-year 24-hour Design Storm. • 50-year 24-hour Design Storm. • 100-year 24-hour Design Storm. If the total area of the site (i.e. total property area) and the drainage area to each stormwater management facility is less than one acre, then a rainfall intensity based analysis (i.e. rational method) may be performed. However, if detention facilities are to be designed and constructed in series, the 24-hour storm criteria will apply regardless of the drainage area. Where downstream conditions indicate that the conveyance and/or storage capacity of existing infrastructure could be impacted by the post development conditions, or where existing structures could be impacted by the post developed conditions, a more stringent standard may be required. For example, if the project site drains into an existing detention pond within the study area then the designer will be required to demonstrate that the discharge rates from the proposed development will still allow the detention pond to operate at a level commiserate with the site in an undeveloped state. Detention facilities should be designed upon the basis of known or projected developments (proposed by the developer) for the contributing drainage basin. Although, the developer is only required to construct the facility with sufficient volume to provide detention for the proposed development, a design shall be provided to the county engineer demonstrating the ultimate configuration of the facility at full build-out. Additionally, the proposed site plan should have sufficient land around the facility reserved to construct the ultimate configuration without significant demolition.