Whitfield County · Zoning Ordinance
Appendix C - STORMWATER LOCAL DESIGN MANUAL
2.2.6. Drainage channels.
About this text
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
For drainage channels designed to convey stormwater runoff either from or to a culvert, the channel should be sized to accommodate the same storm event specified for the pipe system at a minimum.
Channels designed to convey stormwater runoff to detention ponds shall be sized to accommodate the 100-year design storm.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.