--- title: Whitfield County Zoning Ordinance, 3.1. Conveyance Structures collection: local-codes id: local-code:whitfield-county/zoning/3.1 cite_as: Whitfield County, Ga., Zoning Ordinance ยง 3.1 canonical_url: https://georgiacommons.org/code/local/whitfield-county/zoning/3.1 md_url: https://georgiacommons.org/code/local/whitfield-county/zoning/3.1.md text_url: https://georgiacommons.org/code/local/whitfield-county/zoning/3.1/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/whitfield-county/zoning/~appendix-c.md previous: https://georgiacommons.org/code/local/whitfield-county/zoning/2.4.2.md next: https://georgiacommons.org/code/local/whitfield-county/zoning/3.1.2.md index: https://georgiacommons.org/code/local/whitfield-county.md branch: zoning edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/zoning/3.1@2026-05-11-41674acb2f --- # Whitfield County Zoning Ordinance, 3.1. Conveyance Structures > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - STORMWATER LOCAL DESIGN MANUAL 3.1.1. Pipes within the Whitfield County right-of-way (including City of Tunnel Hill and City of Varnell). All pipes located under roadways and within the public right-of-way of Whitfield County, and that are accepted by the county engineer for long-term maintenance, shall be constructed of reinforced concrete pipe (RCP) meeting Georgia Department of Transportation Standards. All pipes must have a minimum of 12 inches of cover from the exterior crown of the pipe, and in accordance with manufacturer's specifications. Pipes under pavement must have a minimum of 12 inches of cover from the exterior crown of the pipe to the bottom of the roadway base. Pipes must have at least 6 inches of clearance between the exterior of the pipe and all underground utilities. In situations where the county engineer has reason to suspect that a pipe system may have not been installed properly, the county engineer may require at his discretion, video inspections of pipe systems to be provided at the owner's expense prior to acceptance of the system.