The county engineer may at their discretion allow proprietary structural controls. Prior to specification of such a device, the designer shall consult the county engineer to determine if the control will be acceptable. Sufficient evidence through testing reports must be submitted to the county engineer meeting the water quality requirements of removing at least 80 percent of the calculated average annual post-development TSS loading.