Skip to content
Georgia Commons
Menu

Whitfield County · Zoning Ordinance

Appendix C - STORMWATER LOCAL DESIGN MANUAL

3.4. Drainage Pipe Easements.

About this text

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All drainage pipe easements are to be the diameter of the pipe plus the width required for trench and slopes to safely maintain or replace drainage structures at a future date. At minimum this easement must be 20 feet and under no circumstance may the easement be within the influence zone of a structural foundation. Additional building set-backs shall be added to the plan as necessary to ensure that structures are not constructed within the easements. This easement width is to account for the required trench and slopes to safely maintain or replace drainage structures at a future date.

4. APPROVED HYDROLOGIC AND HYDRAULIC METHODS

4.1. Hydrologic Methods.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:whitfield-county/zoning/3.4@2026-05-11-dcff503328

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Whitfield County Zoning Ordinance, 3.4. Drainage Pipe Easements | Georgia Commons