Whitfield County · Zoning Ordinance
Appendix A - UNIFIED ZONING ORDINANCE / Article IV - DISTRICT USES AND REGULATIONS
4-7. Additional requirements for PUD and/or MU districts.
About this text
- As published by Municode, current through 2026-05-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
4-7-1 No PUD shall be permitted upon less than fifteen (15) total contiguous acres. For purposes of this Section, lands bisected by streets, railroads, creeks, or gas/electricity/utility easements can be considered contiguous.
4-7-2 The maximum gross density per acre within the PUD district shall not exceed eight (8) dwelling units per acre.
4-7-3 No manufactured home nor mobile home shall be permitted within the PUD or MU district.
4-7-4 Not less than twenty percent (20%) of the total acreage or three (3) acres, whichever is greater, shall be set aside as open space within any PUD district.
4-7-5 No lot or parcel within the PUD district may be served by an on-site sewage management system but shall be served by a Public or Community Sewage Treatment System.
4-7-6 If a PUD is proposed to be developed in phases, not less than 80 percent of all lots and/or parcels within the first phase must be sold prior to the issuance of any permit for phase II, and so on.
4-7-7 Any proposed PUD shall provide for the creation of a homeowners' association, which shall provide for mandatory membership by all owners of a lot or parcel within the PUD, ownership of all common areas, and a perpetual maintenance responsibility for all such common areas.
4-7-8 Any minimum lot area and yard requirements may be waived upon the approval of the site plan.
4-7-9 All single family detached dwellings shall be limited to one principal building per lot.
4-7-10 Approval of a PUD site plan does not exempt the PUD from any applicable subdivision regulations.
4-7-11 The only signs that shall be permitted in PUDs are ground signs, window signs, and wall signs.
4-7-12 All building permits shall lapse twelve (12) months after issuance. Building permits may be renewed prior to expiration, for another twelve (12) month period.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.