The rational method may be used to develop peak runoff flows for culverts with contributing drainage areas less than 25 acres in size and for detention ponds with contributing drainage areas less than one acre in size. All computations shall be in accordance with section 2.1.4 of the GSMM (Volume 2). Rainfall intensities shall be derived from National Oceanic and Atmospheric Administration (NOAA) Atlas14 publication, Volume 9, Version 2, Dalton Station. As specified above, the rational method may be used to size detention facilities. If the rational method is utilized, the DeKalb Method or the Baumgardner/Morris Method (Terramodel) must be utilized to develop runoff hydrographs. Triangular rational method runoff hydrographs may not be utilized in the design of detention facilities.