An existing conditions map should be provided with the report including but not limited to following: • Topography (2-feet or less contour interval) of existing site conditions. • Perennial/intermittent streams, wetlands, lakes and other surface water features. • Drainage basin delineations showing the location of each drainage sub-basin. • Drainage basin delineations for each contributing drainage basin upstream of the project site on an appropriate map (USGS Quadrangle, etc.). • Existing stormwater conveyances and structural control facilities. • Direction of flow and discharge points from the site including sheet flow areas. • Any area of significant depression storage. • Federal, state and local buffers. The map should provide a clear understanding of the various drainage patterns located throughout the site as well as drainage onto the site from upstream areas. Additionally, the map should provide a clear view of the natural features of the site that may impact development.