• Drainage basin delineations showing the point at which the contributing area of the project represents 10 percent of the total drainage basin area as defined in section 3.1.9.2 of the GSMM. • Identify culverts, channels and other structural stormwater controls that the stormwater runoff must pass through prior to the 10 percent point identified previously.