Provide a narrative with associated calculations demonstrating the downstream analysis at various points showing existing conditions, future conditions without detention or other on-site stormwater controls, future conditions with appropriate detention or other on-site stormwater controls, and future conditions with controls that would be put in place if the waiver were granted.