--- title: Whitfield County Zoning Ordinance, 7-9. Application procedures collection: local-codes id: local-code:whitfield-county/zoning/7-9 cite_as: Whitfield County, Ga., Zoning Ordinance ยง 7-9 canonical_url: https://georgiacommons.org/code/local/whitfield-county/zoning/7-9 md_url: https://georgiacommons.org/code/local/whitfield-county/zoning/7-9.md text_url: https://georgiacommons.org/code/local/whitfield-county/zoning/7-9/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/whitfield-county/zoning/~appendix-a/~article-vii.md previous: https://georgiacommons.org/code/local/whitfield-county/zoning/7-8.md next: https://georgiacommons.org/code/local/whitfield-county/zoning/7-10.md index: https://georgiacommons.org/code/local/whitfield-county.md branch: zoning edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/zoning/7-9@2026-05-11-9340d97694 --- # Whitfield County Zoning Ordinance, 7-9. Application procedures > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED ZONING ORDINANCE / Article VII - TOWERS AND ANTENNAE Application for a permit for any tower, antenna, or use of an alternative tower structure shall be made to the Zoning Administrator. All applicants, whether exempt from further review or whether Special Use approval is necessary hereunder, shall complete an application in accordance with this section. If the permit application is not exempt from further review and if Special Use approval is required, the permit application and Special Use application shall be forwarded to the Planning Commission and, thereafter, to the Governing Authority for Special Use review. If the Special Use is approved, the permit application may then be presented to the Chief Building Official for review. Incomplete applications shall not be considered. A complete permit application shall contain, in addition to the information contained upon every application for a building permit in Whitfield County, the following information specifically relating to towers: 7-9-1 Inventory of Existing Towers. An inventory of the applicant's existing towers which are either within Whitfield County, including all municipal corporations located therein and including areas within one-half (1/2) mile of the border thereof, including the specific locations, heights, and designs of each such tower. 7-9-2 A description of the proposed tower's area of service. 7-9-3 Photo simulations or renderings of the proposed tower illustrating the potential visual impact, for Special Use review only. For towers exempt from further review, this Section shall be satisfied by photos or drawings of similar towers. 7-9-4 A site plan or plans to scale specifying the proposed location and dimensions of tower(s,) size of maintenance/operation buildings or uses, access, parking, fences, landscape plans, existing and adjacent land uses. 7-9-5 A site plan for alternative tower structures shall show adjacent rights-of-way, buildings, and structures, including the structure=s height and dimensions, proposed antenna location on the structure or building and adjacent land uses. 7-9-6 A report from a Professional Engineer, currently licensed in Georgia, documenting the following information: (a) Tower height and design, including technical, engineering, economic, and other pertinent data and/or factors governing the proposed tower design. (b) Total anticipated capacity of the structure, including number and types of antennae which can be accommodated. (c) Evidence of structural integrity of the tower structure. (d) Failure characteristics of the tower and demonstration that the site, setbacks, and separation from other uses are of adequate size or distance to protect the safety of the general public and of all nearby landowners. 7-9-7 A written statement from the owner of the tower certifying that the proposed tower site complies with regulations administered by the FAA and FCC, or stating that the tower is exempted from these regulations. 7-9-8 Evidence of compliance with the co-location requirements set forth herein. 7-9-9 If the proposed tower is to be located upon property owned by any unit of local government pursuant to Section 7-3-2, then the applicant shall file either a copy of the lease agreement or other written certification or agreement from such unit of local government that such applicant has the permission of the land owner for the proposed tower facility project. 7-9-10 Any additional information which may be reasonably requested by the Whitfield County Engineer, Chief Building Official, Zoning Administrator, Planning Commission, or Governing Authority, in order to evaluate fully and to review the proposed tower site and the potential impact of a proposed tower and/or antenna.