The stormwater management system map should document the various structural components of how stormwater runoff will be moved around the site. • Location of all non-structural stormwater controls. • Location of all existing stormwater controls to remain after development. • Location of all proposed stormwater controls. • Location of all proposed impoundment type controls (i.e. detention ponds, stormwater ponds, stormwater wetlands, etc.). • Location of all conveyance structures. • All impoundment type controls should be labeled with the following information: • Maximum water surface elevation • Depth and storage volumes for the design storm • Depth and storage volumes maximum water surface if the design storm event is exceeded (i.e. top of dam) • All inlets to conveyance structures should be labeled with the following information: • Maximum design water surface • Maximum potential water surface • All pipes should be labeled with: • Length • Material • Slope • All pipes should be profiled and labeled with: • Length • Material • Slope • Hydraulic grade line • Map showing all contributing drainage areas/sub-basin delineations.