• Narrative describing that appropriate and effective structural stormwater controls have been selected. • Design calculations and elevations for all existing and proposed stormwater conveyance elements including stormwater drains, pipes culverts catch basins, channels, swales and areas of overland flow. • Design calculations and elevations for all structural water quality BMPs to be utilized for water quality improvement. • Design calculations showing that the design meets the requirements of the water quality improvements as outlined in the ordinance and local design manual. The county engineer encourages the designer to utilize the site design tool provided by the North Georgia water planning district to meet this requirement. The tool can be acquired from the following website: http:// www.northgeorgiawater.com/.