The erosion and sedimentation control plan should be included in the report demonstrating the plan to effectively mitigate stormwater impacts during construction. The following elements should be included in this section of the report. • All elements specified in the Georgia Erosion and Sediment Control Act and local ordinances and regulations. • Sequence/phasing of construction and temporary stabilization measures. • Temporary structures that will be converted into permanent stormwater controls.