A buffer, as specified herein below, shall be required when a proposed development abuts property in a less intense zone district, unless the adjacent zone district is already developed with uses similar to the proposed uses. Refer to the following table for the required buffer: DISTRICTS REQUIRED TO BUFFER R-6 R-7 PUD MU C-1A C-1 C-2 C-3 C-4 M-1 M-2 Abutting District Width of Required Buffer GA 15' 15' TBD TBD 15' 20' 20' 20' 20' 30' 30' SA 15' 15' TBD TBD 15' 20' 20' 20' 20' 30' 30' R-1 15' 15' TBD TBD 15' 20' 20' 20' 20' 30' 30' R-2 15' 15' TBD TBD 15' 20' 20' 20' 20' 30' 30' R-3 15' 15' TBD TBD 15' 20' 20' 20' 20' 30' 30' R-4 15' 15' TBD TBD 15' 20' 20' 20' 20' 30' 30' R-5 None 15' TBD TBD 15' 20' 20' 20' 20' 30' 30' R-6 None None TBD TBD 15' 15' 15' 15' 15' 30' 30' R-7 None None TBD TBD 15' 15' 15' 15' 15' 30' 30' PUD None None TBD TBD TBD TBD TBD TBD TBD TBD TBD MU None None TBD TBD TBD TBD TBD TBD TBD TBD TBD C-1A None None TBD TBD None None None None None None None C-1 None None TBD TBD None None None None None None None C-2 None None TBD TBD None None None None None None None C-3 None None TBD TBD None None None None None None None C-4 None None TBD TBD None None None None None None None M-1 None None TBD TBD None None None None None None None M-2 None None TBD TBD None None None None None None None TBD - To be determined by the applicable governing body during the Special Use review approvalprocess. 9-1-1 Buffers shall be located within and along the outer perimeter of a lot or parcel along the side and/or rear lot lines. Buffers shall not be located upon any portion of existing, dedicated, or reserved public or private road right-of-way. 9-1-2 No building permit shall issue for any lot or parcel development requiring a buffer until such time as that buffer, as specified herein, shall be substantially in place or until acceptable surety for the cost of the buffer installation shall be provided to the Building Inspector. Acceptable surety shall consist either of an irrevocable letter of credit from an approved lending institution or a performance bond from an approved insurer in an amount not less than fifteen dollars ($15.00) per linear foot of area to be buffered. The required buffer must be completed and in place within thirty (30) days before any such surety shall lapse or within six (6) months of the issuance of the building permit, whichever shall occur sooner. 9-1-3 If the required buffer shall not be completed and in place as set forth herein, then, in such circumstance, the Zoning Administrator or designee shall have authority to go upon such areas of the subject parcel as reasonable and necessary to construct the required buffer, utilizing the surety previously provided. The Governing Authority shall not be liable for such action unless the Zoning Administrator or his or her designee shall act with gross negligence in coming upon and/or damaging such parcel.