--- title: Whitfield County Zoning Ordinance, 1.1 (Appendix C). Meeting the Stormwater Management Requirements collection: local-codes id: local-code:whitfield-county/zoning/appendix-c-1.1 cite_as: Whitfield County, Ga., Zoning Ordinance, Appendix C, § 1.1 canonical_url: https://georgiacommons.org/code/local/whitfield-county/zoning/appendix-c-1.1 md_url: https://georgiacommons.org/code/local/whitfield-county/zoning/appendix-c-1.1.md text_url: https://georgiacommons.org/code/local/whitfield-county/zoning/appendix-c-1.1/text source_url: https://library.municode.com/ga/whitfield_county/codes/code_of_ordinances date: 2026-05-11 status: active jurisdiction: county:whitfield jurisdiction_name: Whitfield County county_fips: "13313" corpus_version: local-codes-whitfield-county-441d0d56c9e9 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/whitfield-county/zoning/~appendix-c.md previous: https://georgiacommons.org/code/local/whitfield-county/zoning/appendix-c-appendix-c-3.md next: https://georgiacommons.org/code/local/whitfield-county/zoning/2.1.1.md index: https://georgiacommons.org/code/local/whitfield-county.md branch: zoning edition: As published by Municode, current through 2026-05-11 edition_date_kind: current_through source_publisher: Municode version_id: local-code:whitfield-county/zoning/appendix-c-1.1@2026-05-11-0d3913e796 --- # Whitfield County Zoning Ordinance, 1.1 (Appendix C). Meeting the Stormwater Management Requirements > As published by Municode, current through 2026-05-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix C - STORMWATER LOCAL DESIGN MANUAL The following outlines the process for developing a stormwater management plan as required for issuance and maintenance of site development permit in Whitfield County, City of Dalton, City of Tunnel Hill, and the City of Varnell. Pre-Design Phase Step 1. Check for new special district requirements with county engineer. Step 2. Check for concept plan submittal requirements. Concept plan is strongly recommended. Step 3. Prepare concept plan (if required). Step 4. Submit concept plan to county engineer and schedule concept plan meeting (if required). Step 5. Meet with county engineer to discuss concept plan (if required). Design Phase Step 6. Prepare stormwater management plan. Step 7. Submit stormwater management plan to county engineer for approval. Step 8. Execute stormwater inspection and maintenance agreement for all private on-site stormwater management facilities. Step 9. Apply for stormwater management permit. Construction Phase Step 10. After receiving approval from county engineer begin construction. Step 11. Coordinate construction with county engineer inspection staff during construction. Post-Construction Phase Step 12. After construction prepare as-built survey and as-built design certification. Step 13. Adjust stormwater structures if necessary. Step 14. Secure certificate of occupancy/final plat. (Ord. No. 2020-1214, § 5, 12-14-20) 2. GENERAL LEVEL OF SERVICE STANDARDS 2.1. Detention Requirements.