A. The purpose and intent of these standards is to: 1. Promote high quality, long-lasting development and building materials. 2. Enhance visual appeal and livability. 3. Foster architectural diversity and interest, yet achieve a consistent, durable, and pleasing aesthetic. 4. Ensure that large commercial/retail buildings incorporate designs that reduce their visual mass and create the impression of smaller buildings. B. These standards shall apply to properties within any historic district, however, standards in Chapter 19 shall supersede those found in this chapter. C. Application requirements. The application process outlined in this document encompasses both architectural permits and building permits, along with the submission of site plans. 1. Applicants are required to submit drawings that clearly indicate compliance with all the requirements specified in this article. These drawings should be to scale and provide a comprehensive representation of the proposed project, ensuring that all relevant regulations are met. While sealed plans are not mandatory, they should meet the necessary standards and codes. 2. Grouping of Buildings: To streamline the application process and foster originality and design flexibility, groups of buildings located on the same site may be reviewed as a single application. The criteria for grouping buildings together will be specified in the application guidelines, and this practice is encouraged to minimize the number of reviews required. 3. Confirmation of Compliance: Prior to the issuance of a certificate of occupancy, the Zoning Administrator or their designee will play a crucial role in confirming that all aspects of the design have been completed in conformance with the requirements of this section. The exact process for this confirmation will be detailed in the application procedures, ensuring transparency and accountability. D. Setbacks Required. 1. Setbacks are required in all zoning districts as outlined in this chapter. 2. If a building is constructed on a through lot, the front yard setback shall apply to each frontage. 3. If a building or structure is constructed without meeting the specified setback requirements in any zoning district as outlined in this chapter, the following actions shall be taken: i. Compliance Period: The property owner or developer shall be notified of the setback non-compliance by the relevant authorities. They shall be granted a specified period, as determined by the City, to rectify the setback violation and bring the building into compliance with the setback regulations. ii. Remedial Action: During the compliance period, the property owner or developer must take appropriate remedial action to correct the setback violation. This may include adjusting the building's location, obtaining necessary variances or approvals, or any other measures required to meet the setback requirements. iii. Non-Compliance Penalties: If the property owner or developer fails to rectify the setback violation within the specified compliance period, penalties, fines, or legal actions may be imposed as per local regulations. The building may be subject to stop work orders, fines, or other enforcement actions. iv. Occupancy Restrictions: In cases where the setback violation remains unresolved, occupancy of the non-compliant building may be restricted or prohibited until compliance with setback requirements is achieved.