--- title: Woodbine Zoning Ordinance, Sec. 11.1. The following fees have been set by the woodbine planning commission for services listed below collection: local-codes id: local-code:woodbine/zoning/11.1 cite_as: Woodbine, Ga., Zoning Ordinance § 11.1 canonical_url: https://georgiacommons.org/code/local/woodbine/zoning/11.1 md_url: https://georgiacommons.org/code/local/woodbine/zoning/11.1.md text_url: https://georgiacommons.org/code/local/woodbine/zoning/11.1/text source_url: https://library.municode.com/ga/woodbine/codes/code_of_ordinances date: 2026-04-10 status: active jurisdiction: city:woodbine jurisdiction_name: Woodbine place_fips: "1383868" corpus_version: local-codes-woodbine-a69aec4939ff publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbine/zoning/~appendix-a/~article-xi.md previous: https://georgiacommons.org/code/local/woodbine/zoning/10.13.md next: https://georgiacommons.org/code/local/woodbine/zoning/12.1.md index: https://georgiacommons.org/code/local/woodbine.md branch: zoning edition: As published by Municode, current through 2026-04-10 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbine/zoning/11.1@2026-04-10-043143b14f --- # Woodbine Zoning Ordinance, Sec. 11.1. The following fees have been set by the woodbine planning commission for services listed below > As published by Municode, current through 2026-04-10 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article XI - SCHEDULE OF FEES Schedule of Fees Type of Permit Application Fee Process Fee Engineering Review Fee Legal Review Fee Wall 30 70 0 0 Ground 30 70 0 0 Pylon (7 to 75 Feet) 30 95 0 0 Pylon (75 to 100 Feet) 30 145 0 0 Pylon (Over 100 Feet) 30 170 0 0 Rezoning Permit Residential/Commercial/Industrial/Planned Development (0 s.f.—19,999 s.f.) 160 140 140 150 Schedule of Fees Type of Permit Application Fee Process Fee Engineering Review Fee Legal Review Fee Residential/Commercial/Industrial/Planned Development (20,000 s.f.—74,999 s.f.) 260 190 235 150 Residential/Commercial/Industrial/Planned Development (75,000 s.f.—99,999 s.f.) 330 245 235 150 Residential/Commercial/Industrial/Planned Development (100,000 s.f.—149,000 s.f.) 335 240 330 300 Residential/Commercial/Industrial/Planned Development (150,000 s.f. - 299,999 s.f.) 385 290 425 450 Residential/Commercial/Industrial/Planned Development (over 299,999 s.f.) 550 225 565 750 Rezoning Permits for Uses Not Listed Above 160 140 140 150 Special Use Permit 160 140 140 150 Variance Permit 100 150 0 150 Home Occupation Permit 155 145 140 150 Temporary Use Permit 150 0 140 150 Building Fees Type: Fee: Building—New, Addition, Pools, etc. 1/2 of 1% of Total Building Cost, net of following Building—Accessory, Greater than 100 square feet 1/2 of 1% of Total Building Cost, net of following Plumbing 2% of Plumbing Cost Electrical 2% of Electrical Cost Low Voltage Electrical 2% of Low Voltage Electrical Cost HVAC 2% of HVAC Cost Gas 2% of Gas Cost Fire Suppression System 2% of Fire Suppression System Cost Underground Utilities 2% of Underground Utilities Cost * A flat fee of $50.00 shall be charged if the total permit fee for any of the above permits is less than $50.00 Flat Fees Type: Fee: Temporary Power Pole $25.00 Permanent Power $25.00 Flat Fees Above Ground Pools $25.00 Mobile Homes $70.00 Demolition $300.00 Land Disturbing Activities $100.00 Culvert/Additional Driveway Installation $100.00 Inspection of Culvert (Must be 18-inch elliptical. Three eight-foot sections equaling 24 feet long that must be concrete.) $300.00 Penalty Fees Type: Fee: Reinspection Fee $20.00 If any person or organization commences work prior to obtaining a permit will incur an additional charge. $60.00 (Ord. of 01-06-2020(2); Memo. of 1-8-2026) ## Meetings that refer to this section Found 1: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed. - 2025-08-04: [Woodbine City Council regular meeting minutes, August 4, 2025](https://georgiacommons.org/meetings/2025-08-04/woodbine-city-council.md) (minutes) refers to this section: "Section 11.1"