The Land Use Plan Map designates certain areas in the city as having "severe environmental constraints." Such areas shall not be approved for rezoning nor shall any building permits be issued within such designated areas unless the developer sufficiently demonstrates the following: (1) The development property in question is wrongly classified on the Land Use Plan. This shall be demonstrated by having the Soil Conservation Service (SCS) attest to the fact that said property is not on any of the following soils: Rains. Pelham. Bladen. Rutledge. Kingsland. Brookman. Meggett. Satilla. (2) The development parcel does not frequently flood. This shall be attested to by the Solid Conservation Service. (3) The development parcel is not a wetland. It should be noted that work in streams or their wetlands downstream of the headwaters (5 cfs annual average flow; approximately 5-7 square miles of drainage area for this part of Georgia) in natural ponds or lakes of 10 or more acres including their wetlands, or in any tidal area may require a U.S. Army Corps of Engineers permit. Work upstream of the headwaters or in natural ponds or lakes of 10 acres or less may also need to be authorized by a COE permit. See 19 July 1977 Federal Register, Section 323.4. Additionally, saltwater wetlands are protected by the Coastal Marshlands Protection Act (Ga. Law 1970, p. 939, section 1) and modification of these wetlands requires a permit from the Marshlands Protection Division of the Georgia Department of Natural Resources. That soil, flooding, and poor drainage conditions will be overcome satisfactorily by: (1) Site modification; and/or (2) The engineering design of structures, including foundation, buildings, roads and drainage structures. Plans showing these modifications shall bear the stamp of a Registered Professional Engineer.