Skip to content
Georgia Commons
Menu

Woodbury · Zoning Ordinance

Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 1 - SUBDIVISION OF LAND / Article 1-2 - GENERAL PROVISIONS

Sec. 1-207. Easements.

About this text

  • As published by Municode, current through 2022-10-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Easements for drainage or public utilities may be required in connection with any major or minor subdivision as determined by the zoning administrator in conjunction with utility providers. A drainage easement is required and shall be provided along any manmade drainage channel or drainage pipe located outside a street right-of-way. When required, easements shall be shown on the final plat.

(b) The minimum width of any drainage, water, or sanitary sewer easement shall be 20 feet. Easements for water, sanitary sewers and/or drainage purposes may be combined, but must be a minimum of 30 feet if in combination. Pedestrian easements, if required by the zoning administrator, shall be at least ten feet wide.

History

The history line the source prints at the end of the section.

(Ord. of 5-17-2021(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:woodbury/zoning/1-207@2022-10-28-07f9d32a86

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Woodbury Zoning Ordinance, Sec. 1-207. Easements | Georgia Commons