Skip to content
Georgia Commons
Menu

Woodbury · Zoning Ordinance

Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 2 - ACCESS AND ROADS / Article 2-4 - ROAD SPECIFICATIONS

Sec. 2-408. Pavement specifications.

About this text

  • As published by Municode, current through 2022-10-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Roadways shall be constructed and paved with top courses meeting the following standards.

The minimum pavement width, measured from edge of pavement to edge of pavement, (or from the inner edge of curb where curbing exists) shall be as required for the street type in Table 2-4-5.

Table 2-4-5 Street Base Requirements Street Classification Base Binder Topping Arterial Per GDOT Per GDOT Per GDOT Collector 10 inches GAB 4 inches 19 mm Superpaver 2 inches 9.5 mm Superpaver Local Commercial or Industrial Street 10 inches GAB 4 inches 19 mm Superpaver

2 inches 9.5 mm Superpaver Street Classification Base Binder Topping Local Residential Street 6 inches GAB 0 inches 2 inches 9.5 mm Superpaver GDOT = Georgia Department of Transportation GAB = graded aggregate base, compacted to 95 percent modified proctor density.

History

The history line the source prints at the end of the section.

(Ord. of 5-17-2021(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:woodbury/zoning/2-408@2022-10-28-cac5067120

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Woodbury Zoning Ordinance, Sec. 2-408. Pavement specifications | Georgia Commons