--- title: Woodbury Zoning Ordinance, Sec. 2-410. Pavement topping collection: local-codes id: local-code:woodbury/zoning/2-410 cite_as: Woodbury, Ga., Zoning Ordinance ยง 2-410 canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/2-410 md_url: https://georgiacommons.org/code/local/woodbury/zoning/2-410.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/2-410/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-2/~article-2-4.md previous: https://georgiacommons.org/code/local/woodbury/zoning/2-409.md next: https://georgiacommons.org/code/local/woodbury/zoning/2-411.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/2-410@2022-10-28-1ae4223551 --- # Woodbury Zoning Ordinance, Sec. 2-410. Pavement topping > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 2 - ACCESS AND ROADS / Article 2-4 - ROAD SPECIFICATIONS (a) Prime. After the base has been placed, mixed, compacted, shaped, inspected, and accepted, it shall be primed with suitable asphaltic materials as specified in Department of Transportation Specification 412. (b) Roadway binder. After the prime has been inspected and accepted, the roadway or street shall be surfaced with 19 mm Superpaver binder as required for the street type (see Table 2-4-5). (c) Tack coat. Tack coat shall be applied on a prepared road surface according to the requirements of Georgia Department of Transportation Specification 413. (d) Final topping. Final topping shall consist of a course of 9.5 mm Superpaver asphaltic cement as required for the street type as required (see Table 2-4-5). ## History (Ord. of 5-17-2021(1))