(a) Prime. After the base has been placed, mixed, compacted, shaped, inspected, and accepted, it shall be primed with suitable asphaltic materials as specified in Department of Transportation Specification 412. (b) Roadway binder. After the prime has been inspected and accepted, the roadway or street shall be surfaced with 19 mm Superpaver binder as required for the street type (see Table 2-4-5). (c) Tack coat. Tack coat shall be applied on a prepared road surface according to the requirements of Georgia Department of Transportation Specification 413. (d) Final topping. Final topping shall consist of a course of 9.5 mm Superpaver asphaltic cement as required for the street type as required (see Table 2-4-5).