--- title: Woodbury Zoning Ordinance, Sec. 2-413. Slopes and shoulder improvements collection: local-codes id: local-code:woodbury/zoning/2-413 cite_as: Woodbury, Ga., Zoning Ordinance § 2-413 canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/2-413 md_url: https://georgiacommons.org/code/local/woodbury/zoning/2-413.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/2-413/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-2/~article-2-4.md previous: https://georgiacommons.org/code/local/woodbury/zoning/2-412.md next: https://georgiacommons.org/code/local/woodbury/zoning/2-414.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/2-413@2022-10-28-c95bb2a175 --- # Woodbury Zoning Ordinance, Sec. 2-413. Slopes and shoulder improvements > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 2 - ACCESS AND ROADS / Article 2-4 - ROAD SPECIFICATIONS (a) On streets with curbs and gutters, the shoulders shall slope ¼ inch to the foot toward the roadway from back of curb, and no more than ½ inch to the foot for the remainder of the right-of-way width. (b) On streets with swale ditch drainage, the shoulders shall slope ¾ inch to the foot away from the roadway for at least five feet to the drainage channel. The maximum slope for the drainage channel shall be two feet of run for each one foot of fall, with a minimum two-footwide channel at the bottom of the swale. (c) Immediately after grading and filling and re-spreading of topsoil, all areas of disturbed soil shall be fertilized and seeded (or in steep areas sodded or otherwise appropriately treated) with suitable vegetative cover to retard erosion. (d) When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a stand of grass to prevent undue erosion, either by sprigging or seeding. ## History (Ord. of 5-17-2021(1))