(a) When a public water main is accessible, the subdivider or land developer shall install water supply facilities, including fire hydrants, that meet or exceed the specifications of the city and the water service provider. Water mains within subdivisions and land developments must be provided with water main connections to each lot in the subdivision and each land development. (b) The size of water mains shall be justified by hydraulic analysis performed by a professional engineer. (c) Easements shall be provided for water mains, and such easements shall be at least 20 feet wide.