--- title: Woodbury Zoning Ordinance, Sec. 3-203. System maintenance collection: local-codes id: local-code:woodbury/zoning/3-203 cite_as: Woodbury, Ga., Zoning Ordinance ยง 3-203 canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/3-203 md_url: https://georgiacommons.org/code/local/woodbury/zoning/3-203.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/3-203/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-3/~article-3-2.md previous: https://georgiacommons.org/code/local/woodbury/zoning/3-202.md next: https://georgiacommons.org/code/local/woodbury/zoning/3-204.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/3-203@2022-10-28-8b2b9856e5 --- # Woodbury Zoning Ordinance, Sec. 3-203. System maintenance > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 3 - UTILITIES AND DRAINAGE / Article 3-2 - DRAINAGE AND STORMWATER REQUIREMENTS (a) It shall be the responsibility of the developer to maintain all drainage and stormwater management facilities required by approved preliminary plats or development plans during construction and for a two-year maintenance period following approval of a final subdivision plat or issuance of a certificate of development project completion, as applicable. The developer shall be responsible for removing temporary structures or facilities at the completion of the construction. (b) The owner of the property shall be responsible for maintaining the drainage and permanent stormwater management facilities identified by the stormwater management plan to remain after construction is complete, following the two-year maintenance period, until or unless maintenance responsibilities are assigned to a homeowner's or property owner's association. (c) Should an owner or developer, or other responsible party such as a homeowner's association, fail to maintain drainage or stormwater management facilities in a state of service intended by the stormwater management plan, then the zoning administrator shall notify the responsible party in writing of the deficiencies and specific minimum maintenance requirements to remedy such deficiencies. (d) If the responsible party fails to perform the required maintenance work within a reasonable period of time (30 days maximum), then the owner shall be in violation of this ordinance. ## History (Ord. of 5-17-2021(1))