--- title: Woodbury Zoning Ordinance, Sec. 3-205. Specifications for stormwater detention facilities collection: local-codes id: local-code:woodbury/zoning/3-205 cite_as: Woodbury, Ga., Zoning Ordinance ยง 3-205 canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/3-205 md_url: https://georgiacommons.org/code/local/woodbury/zoning/3-205.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/3-205/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-3/~article-3-2.md previous: https://georgiacommons.org/code/local/woodbury/zoning/3-204.md next: https://georgiacommons.org/code/local/woodbury/zoning/3-206.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/3-205@2022-10-28-06e0465f4c --- # Woodbury Zoning Ordinance, Sec. 3-205. Specifications for stormwater detention facilities > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 3 - UTILITIES AND DRAINAGE / Article 3-2 - DRAINAGE AND STORMWATER REQUIREMENTS (a) Stormwater detention facilities shall provide adequate capacity to accommodate the stormwater runoff from the subdivision lots or land development(s) it serves, as determined by a registered professional engineer, landscape architect, or registered land surveyor subject to approval by the city. (b) Unless constructed with 3:1 or lesser slopes and designed as an amenity feature to the subdivision or land development, all stormwater detention facilities shall be surrounded by fencing with a minimum height of four feet with a lockable gate for access. If chain link fencing is utilized, it shall be vinyl coated. (c) A drainage easement with a minimum width of 20 feet shall be required surrounding all stormwater detention ponds. ## History (Ord. of 5-17-2021(1))