--- title: Woodbury Zoning Ordinance, Sec. 3-220. Storm drainage materials and installation collection: local-codes id: local-code:woodbury/zoning/3-220 cite_as: Woodbury, Ga., Zoning Ordinance ยง 3-220 canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/3-220 md_url: https://georgiacommons.org/code/local/woodbury/zoning/3-220.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/3-220/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-3/~article-3-2.md previous: https://georgiacommons.org/code/local/woodbury/zoning/3-219.md next: https://georgiacommons.org/code/local/woodbury/zoning/3-221.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/3-220@2022-10-28-733376995c --- # Woodbury Zoning Ordinance, Sec. 3-220. Storm drainage materials and installation > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 3 - UTILITIES AND DRAINAGE / Article 3-2 - DRAINAGE AND STORMWATER REQUIREMENTS (a) Table 3-2-1 titled "Selection Guidelines for Storm Sewer Piping," sets out guidelines for the use of storm sewer pipes by pipe material and type of installation. Table 3-2-1 Selection Guidelines for Storm Sewer Piping Type of Pipe Installation Reinforced Concrete Pipe Corrugated Steel AASHTO M-36 Corrugated Aluminum AASHTO M=196 Plastic AASHTO M 294 Reinforced Concrete Box Culvert Aluminized Type II CMP Bituminous Coated CMP Aluminum Alloy CMP Corrugated High Density Polyethylene Smooth Lined Per Georgia DOT Standards Longitudinal (grade less than 10%) Yes Yes Yes Yes See Note 1 n/a Longitudinal (grade 10% or more) No Yes Yes Yes See Note 1 n/a Cross Drain, Local Street Yes Yes Yes Yes No n/a Cross Drain, Collector or Arterial Street Yes No No No No n/a Cross Drain, Flowing Stream Yes See Note 3 No No No n/a Type of Pipe Installation Reinforced Concrete Pipe Corrugated Steel AASHTO M-36 Corrugated Aluminum AASHTO M=196 Plastic AASHTO M 294 Reinforced Concrete Box Culvert Aluminized Type II CMP Bituminous Coated CMP Aluminum Alloy CMP Corrugated High Density Polyethylene Smooth Lined Per Georgia DOT Standards Cross Drain, 25-year Flow > 200 cfs Fill Depth > 18 feet See Note 2 See Notes 2 and 3 No See Note 2 No Yes Note 1: Corrugated high density polyethylene pipe, smooth lined type "S", can only be used for residential driveway applications and must be manufactured and installed in strict compliance with Georgia DOT Standard 1030-P. HDPE applications shall not exceed 36 inches in diameter. Note 2: Reinforced concrete box culverts are required under excessive flow and/or fill depth conditions. Approved pipe materials may be utilized in some instances, based on the City engineer's assessment of existing conditions and future maintenance requirements. Note 3: The addition of a Type "A" full bituminous coating is required. (AASHTO M-190) (b) Only over a storm drain is allowed, the developer shall provide an adequate depth and width of compacted backfill to protect the structure from damage or displacement. The developer shall remove any debris or silt that constricts the flow through a pipe as often as necessary to maintain drainage. All pipe structures shall be cleaned before the work is accepted. Any damage or displacement that may occur due to traffic or erosion shall be repaired or corrected at the developer's expense. (c) Trench construction for storm drainage pipe shall be in accordance with GDOT Standard 1030D (or most current). (d) Backfilling of trenches shall be accomplished immediately after the pipe is laid. The fill around the pipe shall be placed in layers not to exceed six inches with each layer being thoroughly compacted. All material shall have an in-place density of 98 percent modified proctor to a depth of six inches below the finished grade, and 95 percent modified proctor at depths greater than six inches below the finished grade. Compaction requirements shall be attained by the use of mechanical compaction methods. Each layer of backfill shall be placed loosely and thoroughly compacted in place. (e) All backfill shall be non-plastic in nature, free from roots, vegetative matter, waste, construction material or other objectionable material. Said material shall be capable of being compacted by mechanical means and shall have no tendency to flow or behave in a plastic manner under the tamping blows. (f) Material deemed by the city as unsuitable for backfill purposes shall be removed and replaced with selected backfill material. (g) Water shall not be permitted to rise in trenches that are not backfilled after the pipe has been placed. ## History (Ord. of 5-17-2021(1))