--- title: Woodbury Zoning Ordinance, Sec. 4-202. Application for development permit collection: local-codes id: local-code:woodbury/zoning/4-202 cite_as: Woodbury, Ga., Zoning Ordinance ยง 4-202 canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/4-202 md_url: https://georgiacommons.org/code/local/woodbury/zoning/4-202.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/4-202/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-4/~article-4-2.md previous: https://georgiacommons.org/code/local/woodbury/zoning/4-201.md next: https://georgiacommons.org/code/local/woodbury/zoning/4-203.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/4-202@2022-10-28-fc85af6c3b --- # Woodbury Zoning Ordinance, Sec. 4-202. Application for development permit > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 4 - DEVELOPMENT PERMITTING / Article 4-2 - APPLICATION REQUIREMENTS AND PROCEDURES An application for a development permit shall include the following, as applicable; completed applications shall be submitted to the zoning administrator. (a) Application form. An application form with information specified by the zoning administrator. Said application form may include but is not limited to name of applicant and contact information, owner and contact information, name of project with location information, proposed source of water service and sewer or septic tank, the name of the professional designer, and the proposed use of the development. The application must be authorized by the property owner. (b) Development name. The name of each development project must have the approval of the zoning administrator. The name shall not duplicate nor closely approximate the name of an existing subdivision or development project in Meriwether County or any of its cities. (c) Address. Provide an address for the site, if already assigned. (d) Checklist(s). A checklist for development permit application submissions, as specified by the zoning administrator. (e) Fees. Payment of any development permit fee, and any associated fees, as established from time to time by the Woodbury City Council. (f) Plan sets and electronic file. All development plans for a project shall be submitted in hard copy (a number of sets specified by the zoning administrator) and digital form (.pdf file). The zoning administrator shall determine the number of plan sets to submit based on the nature and scope of review but which shall be four sets unless specifically indicated otherwise. Plan sets will contain sheets for the following, as applicable: 1. Plat. A copy of the approved recorded plat of the subject property, demonstrating that the property to be developed is a lot of record or part of a lot of record. If land subdivision is proposed or implied in the development proposal, a proposed subdivision plat may be required to be submitted with the development permit application, or the process of subdivision may be deferred until a later stage of the development process. 2. Site plan. A site plan, including at minimum the project location, total project area natural features of the site and proposed development features as required by this ordinance, including easements. 3. Phases. Proposed phasing of the development, if it is proposed to be built in phases or sections. 4. Grading plan. Grading plans as required and specified in this article. 5. Soil erosion plans. The applicant shall include soil erosion plans submitted to the State Environmental Protection Division (note: The City of Woodbury is not a local issuing authority). 6. Stormwater management plan. Stormwater management plans shall show information and plans required by this ordinance, as may be applicable. 7. Utilities plan. Plans for water, sanitary sewer, and other utilities as may be required by the zoning administrator and utility provider. 8. Street improvement plan. If the development proposes new streets, whether public or private, or if this ordinance requires improvement of a city road, the development permit application shall include information demonstrating compliance with the requirements of this ordinance for the improvement of abutting city roads. 9. Other agency approvals. The owner shall be responsible for obtaining approval from all other agencies affected by the project. All agency approvals that are required for the use of the land and structures and for the location and operation of businesses and industries shall be obtained by the applicant and transmitted to the zoning administrator prior to issuance of a development permit, including but not limited to the following (Woodbury is not responsible for delays in approval of development plans when a development permit applicant is required to be approved by an external agency but the applicant has not obtained approval from that external agency with jurisdiction over the development proposal): (a) Health department. Approval or permit from the Meriwether County Health - District 4 Public Health Department for on-site sewage management system or community water system, as applicable; (b) Georgia Department of Transportation. Approval or permit from the Georgia Department of Transportation for access onto a state route if applicable; (c) Georgia Environmental Protection Division. Copy of application for Notice of Intent (NOI) electronically filed, if required, proof of submission of soil erosion plans, and payment of applicable fees to state including NPDES fees; (d) Utility provider. Approval or permit and receipt of payment for any water or sanitary sewer connection fees applicable for the project; (e) Land disturbance bond.For projects involving land disturbance of 20 acres or more, the zoning administrator shall require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the development permit. 10. Other. Other information as may be specified by the zoning administrator, as may be necessary to review the development plan and ensure compliance with this ordinance and the Woodbury Zoning Ordinance (codified as Appendix A of the city Code of Ordinances). ## History (Ord. of 5-17-2021(1))