--- title: Woodbury Zoning Ordinance, Sec. 4-308. Completion of development collection: local-codes id: local-code:woodbury/zoning/4-308 cite_as: Woodbury, Ga., Zoning Ordinance ยง 4-308 canonical_url: https://georgiacommons.org/code/local/woodbury/zoning/4-308 md_url: https://georgiacommons.org/code/local/woodbury/zoning/4-308.md text_url: https://georgiacommons.org/code/local/woodbury/zoning/4-308/text source_url: https://library.municode.com/ga/woodbury/codes/code_of_ordinances date: 2022-10-28 status: active jurisdiction: city:woodbury jurisdiction_name: Woodbury place_fips: "1383896" corpus_version: local-codes-woodbury-1476a063c9c3 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-4/~article-4-3.md previous: https://georgiacommons.org/code/local/woodbury/zoning/4-307.md next: https://georgiacommons.org/code/local/woodbury/zoning/5-101.md index: https://georgiacommons.org/code/local/woodbury.md branch: zoning edition: As published by Municode, current through 2022-10-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:woodbury/zoning/4-308@2022-10-28-85c9556685 --- # Woodbury Zoning Ordinance, Sec. 4-308. Completion of development > As published by Municode, current through 2022-10-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 4 - DEVELOPMENT PERMITTING / Article 4-3 - POST-ISSUANCE PROVISIONS AND ENFORCEMENT (a) Upon completion of the project, the applicant or other responsible party may be required to submit a final hydrological study and shall submit all as-built plans of the project that may be required by the zoning administrator in electronic format. All plans must be in the Georgia Coordinate System West Zone NAD 83. If the project is within 1,000 feet of a geodetic monument the plans must use the monument as a control/tie point. In addition, the applicant shall submit electronic (DWG/DXF and PDF) file copies of information as specified by the zoning administrator which unless otherwise specified shall be limited to water lines, sanitary sewer lines, road centerlines and lot lines for parcels. Building permits may be withheld pending receipt of the electronic files. (b) Upon application and for a fee, the zoning administrator may provide a certificate of project compliance. (c) Once a development project is complete and the site has been stabilized in the opinion of the zoning administrator, the land disturbance bond (if required) shall be released by the zoning administrator. ## History (Ord. of 5-17-2021(1))